arrow_back Supplier Directory
AH
AE Hoskins Building Services (Hoskins Investments Pty Ltd)
ABN unknown
Total Won
$38.3M
Contracts
63
Agencies
12
show_chart Government Revenue Over Time
Contract History
| WA-BMW0495617 | The work covered by this Request is the provision of Electrical Testing Services in the following two categories: Service Category 1 | Department of Housing and Works | $21,300,000 |
| WA-FINW0535921 | The Department of Finance (the Department) facilitates the delivery of maintenance services on non-residential buildings owned by the State Government, including (but not limited to) schools, police stations and office accommodation. Currently, the Department procures maintenance services through the Low Value Maintenance Panel (LVMP), established in July 2014, for the Perth metropolitan and parts of the Peel region. The Panel Arrangement includes 38 Trade Categories and will generally involve individual work valued at less than $250,000 (including GST). The types of work covered under these Trade Categories includes: (a) Breakdown Repairs; and (b) Planned Maintenance: (i) Routine Maintenance; (ii) Restoration Maintenance; and (iii) Minor Improvements. Planned Maintenance will generally involve individual work valued more than $20,000 but less than $250,000 (including GST). The Department is seeking to supplement the following LVMP Trade Categories: Graffiti Removal Restoration and Biohazard Cleaning Tree Management Fume Cupboards Carpet Laying/Floor Coverings/ Repairs Respondents should note that this Request contains the full requirements for all LVMP Trade Categories. Respondents do not have to read the Sections marked ?Not Applicable to this Request? . | (inactive) Department of Finance | $2,040,000 |
| WA-NMHS20205441 | Anti-ligature fixtures and fittings replacement program for North Metropolitan Health Service (NMHS): Graylands Hospital, Selby Older Adult Facility and Osborne Park Hospital. All fixtures and fittings must be designed, tested and approved anti-ligature products specifically designed to prevent accidental and/or intentional injury. Attachment F, FF&E schedule outlines the fixtures and fittings, which have been approved using the following guidelines. Any substitution for the approved schedule items must adhere to the following and be approved by NMHS prior to substitution. | North Metropolitan Health Service | $1,723,291 |
| WA-PTA2011029J2 | Provision of Maintenance, Breakdown Repairs and Small Works on the Urban Rail Network - Paving | Public Transport Authority | $1,209,519 |
| WA-EMHS202413228 | The East Metropolitan Health Services is seeking Offers from suitably experienced Respondents to expand and upgrade fire detection and alarm, and early warning intercommunication, systems on Levels 2 to 6 (inclusive) of O Block at Royal Perth Hospital and construct a new Fire Control Room on Level 2 | East Metropolitan Health Service | $1,061,191 |
| WA-FINW0482020A | Department of Training and Workforce Development (DTWD) Northam CRT - Upgrade and Modernisation works to workshop facilities A non-mandatory site briefing to be held at the site on Tuesday, 18 May 2021 at 13:30 pm (contractors to meet at reception). To confirm attendance at this briefing, you must contact: Paul van Niekerk, Telephone No 08 9423 0000 or email Paul@tz.com.au. | (inactive) Department of Finance | $1,016,674 |
| WA-C000838 | The existing TABs across Western Australia have a combination of ‘Amtote’ and ‘Neo’ terminals, the numbers of which vary per site. The ‘Amtote’ Terminals will no longer be supported by the TAB network. All existing ‘Amtote’ Terminals will be removed from all TABs, and replaced with ‘Neo’ Terminals, being either ‘SST’ (Self Service Terminals accepting cash) or ‘CT’ (Customer Terminals accepting vouchers or winning tickets only). Additional ‘Neo’ Terminals will be required at some sites also, increasing the total number of terminals at some sites (C000801 Neo Products). As well as the terminal upgrade works, many sites (approximately 50%) will require the demolition of the existing ‘Octanorm’ type construction (being an aluminium frame construction with sheet metal signage) currently housing the display screens and terminals. These will be replaced with a new ‘Racewall-lite’ type construction (being a lined steel framed wall construction or similar, with new joinery cabinetry and benchtops) to house the terminals, providing better quality and consistency to all TABs. RWWA is seeking a Builder/Joiner/Cabinetmaker that can cut-out the prefabricated cabinetry, have these ready by the installation date and proceed with the installation at each agency. The project in its entirety (inclusive of regional sites) totals 262 sites and is to be completed by the 30th of October 2021. Further details within the RFT documents. | Racing and Wagering Western Australia | $865,241 |
| WA-DBCABGPA20012022 | The Panel Arrangement is expected to include 6 Trade Categories and will generally involve individual work valued at less than $20,000 (including GST). The Trade Categories include: General Building Maintenance Roof Plumbing Plumbing and Gas Airconditioning - Evaporative Air Conditioning - Refrigerated Painter - Registered The types of work covered by the Panel Arrangement will include: Breakdown Repairs; and Planned Maintenance: | Botanic Gardens and Parks Authority | $600,000 |
| WA-C000850 | To construct four new viewing towers and remove existing towers at Belmont Park Race Club. The new tower one, consists of a steel structure at a height of 9712mm with two viewing cabins with foundation pad 4000x2700x900mm for the tower and two foundation pads 1500x600x450mm to accommodate the steel staircase. Towers two, three, four are the same design but located at different locations around the racetrack. The new towers will consist of a steel structure at a height of 11750mm with one viewing cabin. The foundations consists of 3300x3300x650mm pad for the tower and 1150x1000x350mm pad to accommodate the staircase. | Racing and Wagering Western Australia | $523,755 |
| WA-BMW0038619 | Zoological Parks Authority - Perth Zoo - HV Upgrade A non-mandatory site inspection and/or tender briefing will be held on 4th of July at 10:30am. To confirm attendance at this briefing, you must contact: Michael Webster - Project Director. Michael.Webster@finance.wa.gov.au T:08 6551 1816 | (inactive) Department of Finance | $446,216 |
| WA-PTA210409 | Removing exisiting paving and installing new 60mm thick trafickable paving to the lower street level of Cannington Station | Public Transport Authority | $442,574 |
| WA-PTA210591 | Airport Line Passenger Information Displays Project | Public Transport Authority | $351,334 |
| WA-FINW0395720 | Western Australia Police Force - Maylands Police Complex - Fleet Engineering Upgrade A site visit will be held on 5 November 2020 at 2pm. | (inactive) Department of Finance | $335,783 |
| WA-P26058 | Arena Joodalup (AJ) DAIP Kitchens Upgrades | VenuesWest | $331,315 |
| WA-PTA200797 | PTC - Level Three Office Refurbishment and Fitout | Public Transport Authority | $322,960 |
| WA-C000843 | Uninstall all Amtote terminals (including Pay terminal if replacement provided) and Install & Commission new New Terminals (CT and SST) - Electrical Works. The existing TABs across Western Australia have a combination of ?Amtote? and ?Neo? terminals, the numbers of which vary per site. The ?Amtote? Terminals will no longer be supported by the TAB network. All existing ?Amtote? Terminals will be removed from all TABs, and replaced with ?Neo? Terminals, being either ?SST? (Self Service Terminals accepting cash) or ?CT? (Customer Terminals accepting vouchers or winning tickets only). Additional ?Neo? Terminals will be required at some sites also, increasing the total number of terminals at some sites. (The carpentry and joinery will be awarded under a separate tender: New Racewall-Lite Terminal Fitout (Joinery) Tender C000838). In addition to the terminal upgrade works, many sites (approximately 50%) will require the demolition of the existing ?Octanorm? type construction (being an aluminium frame construction with sheet metal signage) currently housing the display screens and terminals. These will be replaced with a new ?Racewall-lite? type construction (being a prefabricated timber frame wall construction, with new joinery cabinetry and benchtops) to house the terminals, providing better quality and consistency to all TABs. (The carpentry and joinery will be awarded under a separate tender: New Racewall-Lite Terminal Fitout (Joinery) Tender C000838). The project in its entirety (inclusive of regional sites) totals 262 sites and is to be completed by the 30th of October 2021. Full description in Part 4. | Racing and Wagering Western Australia | $314,514 |
| WA-BMW0274619 | Department of Education - Lathlain PS - Roof Replacement Works. A non-mandatory site inspection and tender briefing will be held on Thursday 19/9/2019 at 12:30pm. To confirm attendance at this briefing, you must contact: the person nominated at clause 1.3 of these Preliminaries | (inactive) Department of Finance | $293,593 |
| WA-NMHS20217285 | Office fit out for approximately 150m2 of existing laboratory space at KEMH | North Metropolitan Health Service | $275,000 |
| WA-PTA210282 | Guildford Station Retaining Wall | Public Transport Authority | $239,493 |
| WA-19040824 | RPH Bariatric Facilities | East Metropolitan Health Service | $228,136 |
| WA-P22016 | HBF Arena Stage 3 External Painting | VenuesWest | $218,650 |
| WA-MWSP29CON20203 | Remedial works to external building fabric of Blocks A, B and 4 at Osborne Park Hospital. | North Metropolitan Health Service | $217,003 |
| WA-PWSTMW1920015 | Internal Fit out of the new collection Centre Gyprock stud walls with insulation and doors as per plans 1 new ceiling to main collection centre Commercial grade vinyl Melamine cabinetry Glazing to reception area as shown on plan Light switches and Data and power to each collection room and reception counter Mechanical Services repositioning and balancing | PathWest Laboratory Medicine WA | $210,861 |
| WA-CAHS20217042 | CAHS requires the services of a suitably qualified builder to undertake alterations to Fun on Four at the Perth Children?s Hospital. | Child and Adolescent Health Service | $207,190 |
| WA-NMHS202615925 | Mount Henry Clinic - Partial Roof Replacement including reference to the Panel Arrangement Contract for the Metropolitan Trade Services Breakdown Repairs, Planned Maintenance and Minor Works to Western Australian Health Service Providers. | North Metropolitan Health Service | $169,478 |
| WA-SMHS202616064 | Fitout of West Consult Room – Peel Health Campus (Under HSS304918) | South Metropolitan Health Service | $164,317 |
| WA-BMW0191020 | Department of Education - Parkwood Primary School - Remove existing concertina doors and replace with new operable walls A site visit will be held on: Wed 08 April 2020 at 10:00am | (inactive) Department of Finance | $159,244 |
| WA-CAHS20194901 | Child and Adolescent Health Service (CAHS) requires the services of a qualified Builder to replace the roof and ceiling of properties detailed in this Request. | Child and Adolescent Health Service | $155,307 |
| WA-21084459 | Minor Works for additional beds at Bentley Health Service | East Metropolitan Health Service | $150,000 |
| WA-20HA00D | The project is for improving the conditions for spectators and players in the main grand stand and court areas during winter. During winter games spectators have complained of cold and draughty conditions caused by strong winds blowing through the Southern louvres. Supply and installed Motorised Louvres to Southern Openings. Motorised louvres to be fitted to selected louvred openings on the southern side of the building. The louvres to be installed between the external weather proof louvre and the internal mesh screen. A control switch per louvre to be provided adjacent to the existing fan and air conditioning controllers. Code Compliance Motorised louvres to natural ventilation openings are code compliant with AS 1668.4 which requires a minimum area that is “openable” for compliant natural ventilation. The proposed design is “openable” and is compliant. | VenuesWest | $149,411 |
| WA-MWSP56CON2020 | Upgrades to external access control systems | North Metropolitan Health Service | $138,881 |
| WA-FINW0737122 | Department of Primary Industries and Regional Development - Manjimup Research Station - Refurbishment of House 2 & House 4 (Visitors quarters) | (inactive) Department of Finance | $135,135 |
| WA-NMHS202412813 | On 26th November 2023, a significant fire incident triggered a Code Red within Ashburton House, Montgomery ward at Grayland Hospital (GH) in the Occupational Therapy area. To make the affected area safe and restore continuity of patient services as soon as possible, GH Facilities Management (FM) engaged multiple contractors and consultants as a priority to undertake assessment of fire damage and proceed with urgent damage remediation works. AE Hoskins attended the site on 27th November 2023 to assess the fire damage relating to building infrastructure and immediately undertook the work that included specialised restoration cleaning of all surfaces, treatment and painting of all walls and ceilings and associated asbestos remediation works. GH FM obtained further quotes and estimates from AE Hoskins to complete the remaining remediation works including additional roofing, external repairs and other associated works. | North Metropolitan Health Service | $130,000 |
| WA-WAPOL16125 | The Western Australia Police Force (The Customer) is seeking offers for the Canine Yard Training upgrade at Maylands Complex | Western Australia Police Force | $129,053 |
| WA-CAHS20229324 | The purpose of this project is to carry out Internal painting buildings at 4, 12 and 16 Rheola St, West Perth. | Child and Adolescent Health Service | $125,000 |
| WA-CAHS20218045 | The provision of the construction of wooden box solutions - called under Whole of Health Trades Panel Contract HSS304918 | Child and Adolescent Health Service | $122,843 |
| WA-HSS304918 | BHS Ward 3 Bathroom Renovations | East Metropolitan Health Service | $120,795 |
| WA-WAPOL19723 | Carpet replacement | Western Australia Police Force | $111,035 |
| WA-NMHS202210374 | Replacement and certification of fire doors, frames, fire walls and remediating fire penetrations in walls at King Edward Memorial Hospital (KEMH | North Metropolitan Health Service | $102,962 |
| WA-NMHS20218026 | High risk ACM removal works required with associated remedial works to follow. | North Metropolitan Health Service | $101,490 |
| WA-FINW0618822 | Department of Education - Tooday District High School - Primary Science Room Upgrade | (inactive) Department of Finance | $96,316 |
| WA-FINW0755422 | Department of Education - Waroona District High School - Science Room Upgrade | (inactive) Department of Finance | $91,674 |
| WA-NMHS20205119 | NMHS requires works to be carried out for Smith Ward Pantry Upgrade at Graylands Hospital to meet Health Facilities Guidelines using the panel contract HSS304918 | North Metropolitan Health Service | $80,420 |
| WA-M25002A | HBF Park WWC – DB Plinth – Construction | VenuesWest | $74,679 |
| WA-FINW0137921 | WA Country Health Service - Northam Health Service SP5B and SP7 Vinyl Replacement Builders Works - Direct Purchasing Framework | (inactive) Department of Finance | $70,785 |
| WA-CAHS202311939 | CAHS requires the conversion of existing female Water Closet, currently 2 stalls and 2 basins (WC2 on as constructed drawings), to 1 unisex WC that meets current Accessibility Standards (AS1428.1:2021), design, demolition and construction | Child and Adolescent Health Service | $70,097 |
| WA-NMHS202311584 | Construction of a new dry goods store in the existing Graylands Hospital kitchen to enable the functional relocation from Moore House, Graylands. | North Metropolitan Health Service | $70,000 |
| WA-CAHS202311468 | Stage 1 Workstations: (Triage Area) - Workstation on castors to make fixed and mimic the design of desk in fast track area but make (standard workstation height). Stage 2 works desks: Redesign existing 2 workstations to suit x 4 workstations with 2 monitors on each. New desk to be deeper (700mm) and monitors to be fixed to wall rather than on monitor arms Relocate pigeonholes to adjacent wall to fit new workstations New works to check health facility guidelines whether x 2 egress points are required for seclusion room If not required, a door will need to be blocked out to accommodate the relocation of the pigeon holes. Stage 3 Overflow Wait room: Lockers area to be sectioned off with curtains - Lockers to be removed - Existing joinery to be removed Clinical wash basin to be installed - Write up desk to be installed (Corian/clinical grade Laminex) Doctor’s lounge Part of room to be sectioned off with curtain rail partitioning to create a ‘quiet space’ and split into 2 with curtain rail partitioning Relocate current TV and CCTV to adjacent wall Film to be fitted to glazing Site visit will be accommodated to price up | Child and Adolescent Health Service | $69,816 |
| WA-MW24102 | SCGH C Block Basement Store Refurbishment. | North Metropolitan Health Service | $68,237 |
| WA-CAHS20194869 | The Customer is seeking offers for the Refurbishment of infrastructure at Bentley Child Development Services (CDS) ? Corner of Treasure Road and Andrea Way, Queens Park. | Child and Adolescent Health Service | $65,703 |
Agency Relationships
Department of Housing and Works
$21.3M
1 contracts
(inactive) Department of Finance
$4.8M
13 contracts
North Metropolitan Health Service
$3.2M
14 contracts
Public Transport Authority
$2.6M
7 contracts
Racing and Wagering Western Australia
$1.7M
3 contracts
East Metropolitan Health Service
$1.6M
5 contracts
Child and Adolescent Health Service
$968.2K
10 contracts
VenuesWest
$774.1K
4 contracts
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.