arrow_back Supplier Directory
EP
Elec Power Technologies Pty Ltd 4 Carson Road Malaga WA Australia 6090
ABN unknown
Total Won
$4.7M
Contracts
15
Agencies
3
show_chart Government Revenue Over Time
Contract History
| WA-PTA220607 | PTC UPS A and B Replacement | Public Transport Authority | $1,325,226 |
| WA-PTA240456 | PTA has over 100 Uninterruptible Power Supply (UPS) sites at stations, depots and facilities across the urban network. This project aims to replace UPS units at 10 sites which are at their end-of-life phase. These are to be delivered from now until 31 December 2025. N&I Signals have identified a number of Uninterruptible Power Supply (UPS) Systems across the urban railway network that have reached their end of life and require replacement. The following UPS replacements locations are; Gosnells SER Currambine CER Stirling SER Mandurah Station Maylands Station Perth Station Nowergup Depot North Fremantle Claisebrook SER Karnup Station | Public Transport Authority | $1,024,107 |
| WA-PTA230379 | Supply, Installation, Test, Commission and Maintenance of Uninterruptible Power Supply (UPS) Systems and Power Conditioners | Public Transport Authority | $535,248 |
| WA-PTA190728 | UPS - Power Supply Maintenance | Public Transport Authority | $250,000 |
| WA-PTA250665 | The Public Transport Authority (PTA) aims to enhance asset management through improved condition monitoring and predictive capabilities. Currently, backup batteries at the Public Transport Operations Control Centre (PTOCC) and Perth Busport UPS room are only checked during routine maintenance, leaving potential failures undetected and posing a fire hazard. | Public Transport Authority | $246,724 |
| WA-PTA210307 | Power Conditioner - Capacitor Replacement | Public Transport Authority | $231,427 |
| WA-PTA210935 | Joondalup Station Power Conditioner | Public Transport Authority | $222,653 |
| WA-C100110 | Supply of Drawings of equipment as per RWWA Standard approved document sets. Rite on Site Freight to Racing and Wagering ? Osborne Park, Battery Cabinets Installation Normal Hours of batteries into cabinets and internal cabinet wiring only Re-configuration and re-commissioning of Systems MS alarm checks after commissioning. | Racing and Wagering Western Australia | $165,751 |
| WA-PTA210936 | Perth Busport Uninterruptible Power Supply | Public Transport Authority | $162,866 |
| WA-DBCA408WQ3732023 | DBCA is seeking a Western Australian Licenced Electrical Contractor experienced with solar/battery/generator hybrid systems to provide comprehensive electrical services to Penguin Island for the defined period of March 2023 to June 2025 (inclusive) | Department of Biodiversity, Conservation and Attractions | $150,000 |
| WA-PTA200936 | As part of the METRONET Claremont Station Project the PTA is constructing a new Signalling Equipment Room to the west of Swanbourne Station. The PTA is supplying the contractor a UPS unit for inclusion into the SER. | Public Transport Authority | $138,246 |
| WA-PTA210639 | Alternative Train Control Facility (ATCF) - Uninterruptible Power Supply (UPS) Supply, Install & Commissioning | Public Transport Authority | $123,984 |
| WA-DBCA408GQ3532023 | Supply and installation of Lithium Batteries at Penguin Island | Department of Biodiversity, Conservation and Attractions | $102,575 |
| WA-PTA220351 | Uninterruptible Power Supply & Maintenance | Public Transport Authority | $68,623 |
| WA-PTA210013 | Introduction and Background The Public Transport Authority (PTA) has a large quantity of low voltage (LV) power supply assets that supply power to numerous sites (primary and secondary power to signalling, train control, traction power and communications systems) across the metropolitan rail network. These assets are of critical infrastructure and require maintenance, replacement and upgrades to enable safe, efficient and sustainable rail passenger transport services. Additionally, LV power assets also supply power to emergency backup, response and control systems such as alarms, standalone equipment rooms (SER), CCTV equipment, uninterruptable power supply (UPS) systems, and other essential, critical and non-critical installations. The PTA intends to establish a panel contract for the below Services: Group | Public Transport Authority | $1 |
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.