arrow_back Supplier Directory
D
Dowsing Group (Dowsing Group Pty Ltd)
ABN unknown
Total Won
$8.7M
Contracts
21
Agencies
3
show_chart Government Revenue Over Time
Contract History
| WA-PTA250913 | As part of the new Midland Station Project, the Midland Junction Alliance (MJA) is planning a full closure of the Midland Rail Line in early 2026 to enable major construction works. During this period, train replacement bus services will operate between Midland and Bassendean stations for an extended duration. To ensure the reliability and efficiency of the train replacement bus services, it is critical that the Bassendean Bus Interchange is upgraded to support increased operations. The project will focus on the expansion of bus stand capacity and associated infrastructure to mitigate risks of overcrowding, delays, and service inefficiencies. | Public Transport Authority | $1,674,518 |
| WA-PTA240660 | The project works entails a comprehensive resurfacing and pavement reconstruction of the existing Armadale Line Station Carparks – Challis Station, Seaforth Station, Sherwood Station, and Kenwick Station, addressing the significant deterioration that has occurred over time. The surface is currently in poor condition, as evident by the presence of numerous potholes that pose safety hazards to vehicles and pedestrians. Additionally, severe cracking and structural failures in the pavement have compromised its durability, while extensive kerb damage has further impacted the functionality and aesthetic appeal of the area. These works aim to restore the car park to a safe, durable state, ensuring it meets modern Disability Discrimination Act (DDA) standards and can withstand future usage demands effectively. The works is required to be scheduled during an approaching period of low patronage, allowing the upgrades to be completed efficiently while reducing the impact on users of the facilities. This timing also addresses the urgent need to fix the car parks before further deterioration occurs. | Public Transport Authority | $805,456 |
| WA-MRWA001225 | Removal and installation of air valve pipe, pavement and associated works. Pre-qualification Required - R2 (or higher) | Main Roads Western Australia | $753,588 |
| WA-PTA230469 | Civil Maintenance ? Facilities & Infrastructure | Public Transport Authority | $750,000 |
| WA-PTA240632 | The project involves the replacement around the perimeter of the sub-feeder station due to age and deterioration of existing fencing. The key outcomes are to enhance esthetics, durability and safety of high voltage assets and PTA staff. The scope includes the removal of old fencing, preparation of new footings, installation of new fencing, installation of crash barriers and any related finishing work. All work is to be completed as per PTA Specification 8803-000-002 Maintainability and Constructability and any associated PTA Specifications. | Public Transport Authority | $709,303 |
| WA-PTA220601 | Construction of Wellington St Bus Embayments at Perth Train Station | Public Transport Authority | $694,100 |
| WA-PTA250240 | Construction of modified bus embayment to produce an additional operational bus stand. | Public Transport Authority | $421,320 |
| WA-PTA250494 | The PTA seeks a contractor for the provision of works including the pre-construction planning required for the delivery of a modified bus embayment and construction of a new bus stop boarding area. | Public Transport Authority | $365,933 |
| WA-PTA240602 | The Public Transport Authority operate train replacement buses when planned and unplanned activities or incidents occur on the Transperth train network. With the opening of the Ellenbrook Train Line train replacement buses will operate from Bayswater Station in addition to those that could also be required for any disruption to the Midlands or Airport Train Lines. In the event that there are simultaneous disruptions to all three train lines it is foreseen that large volumes of train replacement buses would need to operate from Bayswater Station. The PTA seeks the provision of Works, including (but not limited to): the pre-construction planning required for the delivery of a bus layover at the identified location on Railway Parade, near Clavering Road, Bayswater. This will include all necessary traffic management and noise management plan (if required) preparation and submission to the relevant approving authorities. Any required liaison with identified underground utility asset owners should also be completed to receive advise on any constructability issues and methodologies. This liaison should result in ultimate approval being obtained to proceed to construction. establishing a works compound as necessary and obtain all necessary landowner approvals for the period of construction. any required underground service location. the construction of a train replacement bus layover in accordance with the scope detailed on drawing number 910/10 (Bus Stop on Railway Parade after Clavering Road, Bayswater – Rev03). as-constructed drawings submitted to the PTA as digital files on project completion. | Public Transport Authority | $349,505 |
| WA-PTA250318 | The existing embayment is substandard and PTA aims to modify the embayment to enable this to more safely accommodate buses.. | Public Transport Authority | $248,640 |
| WA-PTA250818 | This proposed procurement involves carpark resurfacing and pavement reconstruction of the existing Challis (East and West) carparks. These works are required due to the deteriorated condition of the existing surfaces, which show extensive wear and structural failures, as well as widespread kerb damage.The objective of this proposed procurement is to restore the functionality and integrity of the carpark areas by improving surface quality to ensuring a safer and more durable environment for users of the facility. | Public Transport Authority | $241,050 |
| WA-PTA250912 | Construction of an indented bus embayment, disabilty compliant bus stop boarding areas and connecting footpath. | Public Transport Authority | $219,670 |
| WA-PTA240505 | The Public Transport Authority are looking to provide an on-street bus embayment on Breakwater Drive in Two Rocks for existing bus stop #27580. The contractor will construct the bus embayment in accordance with the detailed design and specification. | Public Transport Authority | $219,243 |
| WA-PTA250464 | The Public Transport Authority (PTA) operates Route 357 bus services along Suffolk Street in Caversham with this route serving bus stop 27488 Suffolk Street before Colorino Avenue. The PTA seeks the provision of Works for the construction of a new indented bus embayment. | Public Transport Authority | $217,780 |
| WA-PTA220239 | Bus Embayment Works - Blackwood Meander Wanneroo | Public Transport Authority | $217,256 |
| WA-MRWA002423 | Plant hire of a pavement profiler and support equipment and manpower for direct managed works to deliver the 2023 winter pavement repair program | Main Roads Western Australia | $183,108 |
| WA-PTA220244 | Bus Stop 20708 Embayment Upgrade Dumbarton Road | Public Transport Authority | $159,157 |
| WA-PTA240611 | The project involves the replacement of existing floor tiling at Mount Lawley Station in the western carpark due to age, deterioration of the existing surface and structure. The key outcomes are to enhance aesthetics, safety, and durability for the travelling customers and PTA staff. The scope includes the removal of the old retaining wall, preparation for the new retaining, installation of new retaining blocks, removal of adjacent damaged footpath, installation of new footpath and any related finishing work. | Public Transport Authority | $143,775 |
| WA-PTA220241 | Bus Stop 26640 Embayment Installation at Gay Street | Public Transport Authority | $142,134 |
| WA-PTA240676 | The Public Transport Authority (PTA) operate ferry services between Elizabeth Quay, Perth and Mends Street Jetty, South Perth. When planned or unplanned disruptions take place to ferry services the PTA are required to maintain public transport access by providing a ferry replacement service. At present there is no formal disability compliant bus stop located close to the Mends Street Jetty. The PTA has permanently acquired the use of a number of on-street parking bay on South Perth Esplanade near the intersection with Harper Terrace. The City of South Perth have agreed to this on the proviso that the PTA offset the loss of the parking by increasing the capacity of the adjacent off-street City of South Perth car park (SPE3 Car Park). The PTA is seeking to engage a construction contractor to construct a disability compliant bus stop hardstand and connecting path, and construct the adjacent off-street car park modification to the satisfaction of the City of South Perth. | Public Transport Authority | $108,987 |
| WA-RFQWA2523725 | Programmed Facility Management Pty Ltd (PFM) on behalf of Building Management and Works (BMW) and Department of Fire and Emergency Services (DFES) are seeking quotes from suitably qualified and experienced contractors to undertake RCR concrete pad and drainage works at Falcon Volunteer Fire Station. | Programmed Facility Management | $98,936 |
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.