SMEC Australia Pty Ltd Level 14 109 St George's Terrace Perth WA Australia 6000
ABN unknown
Total Won
$11.6M
Contracts
65
Agencies
1
show_chart Government Revenue Over Time
Contract History
| WA-PTA230680 | The scope of this engagement is limited to the valuation of PTA?s owned assets contained within PTA?s Fixed Asset Register (FAR) in line with the two asset profiles of Freight Network Infrastructure and Rail Infrastructure. Note that each asset profile represents a number of physical assets, outlined below. Freight Network Infrastructure assets comprise of permanent way (rails, ballast, sleepers, earthworks, culverts, etc.); civil structures (bridges, tunnels, level crossing, roads and approaches); traction power, communications and others. These assets are generally located in remote areas, in addition to site visits, satellite imagery can be used. PTA can provide drone images over the entire Freight Network which will be provided to the successful Consultant. A remoteness factor should also be considered in this profile. Rail Infrastructure assets comprise of permanent way (rails, ballast, sleepers, turnouts etc.); civil structures (bridges, underpasses, tunnels, retaining structures, crash barriers); electrical infrastructure (traction and non-traction power, overhead line equipment); rail stations (structures, car parks); rail systems (level and pedestrian crossing, signals) and railcar depots primarily within the urban rail network. This asset profile is considered to be the most complex. This asset is expected to be an area of significant focus. Specialist personnel with relevant experience in civil, track and electrical engineering are required. Although this primarily comprises urban network, the inclusion of regional stations requires specific distinction due to the material differences from the urban network. This profile requires both valuations, for the financial and insurance purposes. | Public Transport Authority | $548,292 |
| WA-PTA190611A | This scope is to develop detailed engineering designs and deliverables (SWTC, engineering drawings, specifications including Safety in Design, reviews and approvals) for 85% design and 100% design stages and delivery of Issued for Construction (IFC) deliverables necessary to enable construction of this underpass, the bus interchange and associated works as part of the Claremont Station Project. | Public Transport Authority | $544,495 |
| WA-PTA190824 | Project Engr Geotechnical - METRONET | Public Transport Authority | $400,400 |
| WA-PTA190736 | Low Voltage (LV) Critical Supplies Perth Yard West | Public Transport Authority | $388,328 |
| WA-PTA240265 | In 2020, the PTA engaged SMEC to develop a comprehensive design package for the implementation of Low Voltage (LV) Critical Supplies System at Perth Yard West, encompassing all relevant disciplines and IFC documentation was issued to PTA. During a subsequent gap analysis conducted by PTA, it was identified that certain aspects of the deliverables required updates to address all identified gaps and ensure completion of the detail documentation to IFC level. This Request seeks the provision of Consultancy Services from Respondent to complete this Request scope. | Public Transport Authority | $379,147 |
| WA-PTA240454 | The PTA are looking to appoint a consultant to undertake structural investigations, remediation work methodology and costing for the rail bridge assets (packages). The scope of services has been divided into the following packages: Package A: Armadale line – Rail Bridge, Goongoongup Bridge Package B: Fremantle Line – Rail Bridge, Victoria Quay (Beach St) Package C: Armadale Line – Rail Bridge, Great Eastern Hwy (Rivervale) Package D: Armadale Line - Rail Bridge, Byford (Abernethy Bridge) Package E: Mandurah Line - Rail Bridge, Paganoni Road Up and Down Main Based on each bridge's existing condition, the investigation tasks would involve Level 2 detailed visual inspection, Level 3 engineering assessment (durability), Load rating assessment, remediation works to design and cost estimate. | Public Transport Authority | $329,805 |
| WA-PTA240284 | The Public Transport Authority (PTA) provides public transport services which includes rail, bus, and ferries network. The PTA requires high level valuation services to be conducted on their System Infrastructure assets located across urban rail and bus infrastructure networks. Revaluations are done every 4 years and the battery limits of PTA’s System Infrastructure Assets must be fully defined by August 2024 in preparation for delivery of a final financial valuation report in June 2025 for System Infrastructure. System Infrastructure comprises of communication type of assets, such as communication cabling, power supplies, infrastructure, CCTV network, network monitoring systems, passenger information network systems, security systems, control systems and ticketing. The summary of asset classes (Fixed Asset Classification Structure) and the extract from the Fixed Asset Register (FAR) are provided as attachments. The scope of this engagement is limited to the valuation of the PTA owned assets contained within the PTA’s asset register as at 31 March 2024. Please note that one asset in asset register may represent a number of physical assets; e.g. all radio communication equipment on Midland line is presented as one asset in the asset register. | Public Transport Authority | $324,752 |
| WA-PTA200255 | LV Critical Supplies ? Perth Yard East Standalone Equipment Room (SER) | Public Transport Authority | $317,576 |
| WA-PTA190749 | The Consultant shall assist the PTA Major Projects Unit (MPU) Project Communications Engineering Manager in the planning, specification, procurement and contract management of the MPU projects. The Consultant is expected to be a member of the MPU core team and will require a near to full time presence (maximum of 40 billable hours per week) in the PTA Project Office during the term of the consultancy. The Consultant will be allocated to one or more of the above MPU projects and lead a specific discipline within those projects, in this case communications. Others have been or will be engaged to focus on other areas of other disciplines and the Consultant will work closely with other resources within PTA to offer technical expertise in the allocated discipline. | Public Transport Authority | $261,976 |
| WA-PTA240605 | Goongoongup rail bridge is a PTA owned structure spanning over the Swan River, between East Perth and Burswood (Armadale Line). Following construction of the bridge in 1995, significant south-westerly movement of the eastern abutment and approach structure was observed. Design allowance for displacement was exceeded, requiring remedial action. Part of assessing the structure and determining appropriate remediation included an ongoing monitoring survey program, established in August 2002. Between September 2011 and October 2012, an anchoring system was constructed on the eastern abutment and approach structure to reduce displacement, after which, periodic surveys were continued to monitor ongoing movement and determine effectiveness of the anchoring design. The PTA requires the services of an engineering consultant to oversee a surveyor to continue monitoring surveying, then report on results and provide feedback. | Public Transport Authority | $252,808 |
| WA-PTA210544 | Coordinating Project Engineer - Inner Armadale Line Level Crossing Removal | Public Transport Authority | $249,946 |
| WA-PTA200921 | Civil Maintenance - Consulting Engineers | Public Transport Authority | $248,226 |
| WA-PTA240336 | The PTA as part of the shift of freight responsibilities from Safety Freight Business Management Services (SFBMS) to Infrastructure Planning & Land Services (IPLS) Rail Engineering, has identified the need for additional resources to manage the increase in workload. This represents a high value opportunity for the PTA to develop a greater understanding of its freight responsibilities, and to expand its functions in this area. The works required are a number of high priority engineering tasks, to which additional resources are needed to assist in managing the increased volume of these activities. The PTA seeks the provision of Services, including (but not limited to): Technical Assessment of 5 yearly freight audits: Perform Freight Audit gap analysis and risk identification. Prepare Scope for 2025 Freight Audit. Review of Refurbishment and Maintenance activities subsequent to 5 yearly audit and identify maintenance activity gaps. Record Management: Identify appropriate asset records for track condition monitoring. Review Arc’s Digital Twin asset management documentation. Facilitate PTA’s needs for Digital Twin Performance Indicators. Perform gap analysis on records management. Asset Valuation and Freight Condition Assessment: Review PTA’s existing fixed asset register. Review PTA’s fixed asset stocktake information. Perform gap analysis on fixed asset register and stocktake information. | Public Transport Authority | $247,770 |
| WA-PTA200875 | Asset Renewal Program - Drainage Engineering Services | Public Transport Authority | $247,500 |
| WA-PTA220531 | Current Load Rating of Footbridges | Public Transport Authority | $247,375 |
| WA-PTA250609 | The Public Transport Authority (PTA) seeks a qualified and experienced consultant to conduct an engineering assessment of station underpasses across the Perth Urban Rail Network. The objective is to evaluate the structural integrity, load capacity, and operational requirements of these assets, ensuring they meet Rail Safety and On-Time-Running (OTR) Reliability requirements. | Public Transport Authority | $234,063 |
| WA-PTA210646 | METRONET Railcars - Quality & Commission | Public Transport Authority | $233,446 |
| WA-PTA240698 | The PTA intends to enable signalled turnback movement functionality at existing Bassendean turnback to minimise the impact of disruptive events on scheduled train operations and improve operational flexibility during partial line closures on outer Midland line in the long term. The works will include electrification of the existing unwired crossover between points 763A and 763B. This will require decommissioning of an existing isolator, 2x booster transformers, and commissioning of 2x new motorised isolators. The project engineering and construction works interface with signalling, overhead, communications, operational technology, and track disciplines. The Scope of Services is separated into three design packages, Design Package 1 – Communications Design Design Package 2 – Low Voltage Design Design Package 3 – Undertrack crossing for conduits/ cables | Public Transport Authority | $230,820 |
| WA-PTA190683 | Stadium Station Signal Upgrades - Signalling Design | Public Transport Authority | $227,735 |
| WA-PTA210476 | Load Rating of Existing Rail Bridge and Underpass Structures (Package B3) | Public Transport Authority | $225,434 |
| WA-PTA200504 | Condition Reports - Mandurah Line | Public Transport Authority | $205,348 |
| WA-PTA240288 | The PTA, as part of transferring freight responsibilities from the former Safety Freight and Business Management Systems (SFBMS) division to IP&LS Rail Engineering, has identified the need for additional resources to effectively handle the increase in workload. This represents a high value opportunity for the PTA to develop a greater understanding of its freight responsibilities, and to expand its functions in this area. The works required are a number of high priority engineering assignments, to which additional resources are needed to manage the increased volume of these activities. The nature and role of these tasks closely align with Engineering support required by ongoing Maintenance Strategy works. This primarily includes reviewing concept design plans and refining long listed depot options. As multiple sites are identified as part of the feasibility design works, this long list will need to be further refined based on PTA’s future response requirements. This pertains to the potential designs of new maintenance infrastructure, in line with land selection based on review with Network and Infrastructure (N&I) division stakeholders. As a result, the PTA requires the services of a qualified engineering professional to support the two aforementioned projects | Public Transport Authority | $198,742 |
| WA-PTA210472 | Load Rating of Existing Rail Bridge & Underpass Structures (Package B2) | Public Transport Authority | $198,570 |
| WA-PTA190581A | The PTA is seeking to appoint suitably qualified and experienced Project Engineer?s for the Bellevue Depot project in the following Civil Engineering Disciplines: Civil Engineering Project Engineer Structures Project Engineer Geotechnical Project Engineer Roads, Drainage & Services Project Engineer Earthworks Project Engineer | Public Transport Authority | $198,000 |
| WA-PTA190648 | Rail, road, feature and underground services survey according to the specifications detailed in section 1.4 and within the boundary specified in Appendix A. | Public Transport Authority | $196,193 |
| WA-PTA200345 | Claremont Station Project - Cottesloe Station Works for DMO. Showgrounds Cable Routes and Permanent On-Tracking Facility near Grant Street Station | Public Transport Authority | $194,310 |
| WA-PTA210813 | Goongoongup Bridge Engineering Support | Public Transport Authority | $185,961 |
| WA-PTA200326 | KRFF Bulk Earthworks and Drainage Design | Public Transport Authority | $181,832 |
| WA-PTA190897 | Thornlie-Cockburn Link and Yanchep Rail Extension Traction Power Project Engineers | Public Transport Authority | $178,750 |
| WA-PTA190889 | Bayswater Station & Turnback - Building Services Engineers | Public Transport Authority | $176,000 |
| WA-PTA210904 | Cowie Court Design Intent | Public Transport Authority | $170,047 |
| WA-PTA200631 | Midland Line Operational Issues (Indian) | Public Transport Authority | $169,929 |
| WA-PTA200095 | The scope of this traffic modelling study includes a combination of Mesoscopic, Microscopic and Intersection SIDRA Modelling of the surrounding network for the following level crossings removals program: ? Mint Street, Oats Street & Welshpool Road (Oats Street project); and ? Hamilton Street, Wharf Street and William Street (Wharf Street project). This will include Intersection Layout Justification Analysis and investigate different intersection configurations to the assess resulting network performance of the modelling area. | Public Transport Authority | $164,262 |
| WA-PTA230300 | Feasibility Study for Network and Infrastructure (N&I) Maintenance Strategy | Public Transport Authority | $150,000 |
| WA-PTA251111 | The PTA requires Level 1 Inspections to be undertaken on an as-needed basis as part of the Preventative Maintenance and Asset Management Plan requirements of the branch. Special Event Inspections may also be required after incidents such as heavy rains, flooding, vegetation impacts, or fire events. | Public Transport Authority | $140,976 |
| WA-PTA200929B | Civil Engineering Specification Support | Public Transport Authority | $137,500 |
| WA-PTA200603B | Project Engineers, Civil Engineering | Public Transport Authority | $135,080 |
| WA-PTA200358 | Level 2 Bridge Inspections on Armadale and Mandurah Rail Lines | Public Transport Authority | $134,321 |
| WA-PTA210757 | Whitfords Turnback Upgrade | Public Transport Authority | $132,486 |
| WA-PTA190890 | Thornlie Cockburn Link and Yanchep Rail Extension Operational Technology Project Engineer | Public Transport Authority | $130,416 |
| WA-PTA201027 | CLAISEBROOK RAIL DEPOT ADDITIONAL PARKING - PARKING DECK CONCEPT DESIGN | Public Transport Authority | $127,050 |
| WA-PTA200527B | Load Rating of Existing Rail Bridge and Underpass Structures - Midland Line Assets | Public Transport Authority | $125,514 |
| WA-PTA190731 | Scope of Services The Consultant shall provide engineering and design services to develop concept designs for each of the following four (4) options. Option 4B ? rev1 ? Option 4 plus make existing underpass DSAPT compliant Option 5 ? rev 1? New DSAPT compliant Underpass and Ramps from East End Station Platform Option 7a? Platform extension + connect to the existing underpass and make it DSAPT compliant Option 7b? Platform extension with new DSAPT Underpass and Ramps | Public Transport Authority | $122,502 |
| WA-PTA230542 | Kalgoorlie Footbridge - Load Rating assessment - N35669 | Public Transport Authority | $121,882 |
| WA-PTA200477 | Claremont Station Project - Gugeri Stree | Public Transport Authority | $115,826 |
| WA-PTA190916B | Building Services Project Engineers Mechanical | Public Transport Authority | $104,500 |
| WA-PTA210439 | Pier Street Carpark Sheet Piles Retaining Wall Investigation | Public Transport Authority | $103,754 |
| WA-PTA190878 | PTC Critical Infrastructure WP 4 Electrical Supply Upgrade - Reference Design | Public Transport Authority | $103,527 |
| WA-PTA230644 | Seek services of a suitably qualified and experienced consultant to undertake engineering assessment and remediation detailed design | Public Transport Authority | $101,340 |
| WA-PTA200888 | Project Engineers - Platform Signalling Upgrade Program - PMC Project | Public Transport Authority | $100,000 |
Agency Relationships
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.