arrow_back Supplier Directory
AE
Accenture Australia Pty Ltd Exchange Tower, Level 34 2 The Esplanade Perth WA Australia 6000
ABN unknown
Total Won
$113.9M
Contracts
5
Agencies
3
show_chart Government Revenue Over Time
Contract History
| WA-LG01282023 | Spatial WA is a program of work, which proposes to deliver of a whole of government Advanced Spatial Digital Twin (ASDT) comprising of: Category A: A Next Generation Spatial Cadastre (NGSC) which will provide the technology to uplift the State's current 2D spatial cadastre to maintain property rights, restrictions, and responsibilities in 3D/4D across Government. Category B: A Spatial Digital Twin (SDT) platform, which will provide a digital, spatially accurate representation of the built and natural environment, with the capability to share, discover, visualise and analyse data about a specific place, at a specific time. The ASDT will be enabled through a framework for data modernisation that will support agencies in uplifting their data, aligned to the 3D/4D spatial cadastre, with appropriate governance. Developed in consultation with over 30 agencies (including government trading enterprises), the ASDT will provide the digital capability to share, discover and visualise the State' s data, with advanced capabilities for analytics, predictive modelling, and digital workflows. Landgate will lead Program delivery and work closely with partner agencies. The initial five years of the program (Horizon One) focuses on implementation NGSC and SDT demonstrating the outcomes required through four priority use cases along with data modernisation. Following this, the ASDT will be upscaled for broader use in the public and private sectors. | Landgate | $113,641,220 |
| WA-PTA200894 | Infrastructure Monitoring SCADA (IMS) Equipment Tree Implementation | Public Transport Authority | $128,986 |
| WA-PTA240300 | During the 18 months closure of the Armadale train line, PTA intends to commission a signalling interlocking upgrade, decommission an existing motorised isolator (MI) and 2x booster transformers, and commission two new MIs near Seaforth station. There are also some minor cable containment works within Gosnells SER. The project engineering and construction works interface with signalling, overhead, communications, operational technology, low voltage, and track disciplines. A new PLC shall be designed, developed and installed in the Gosnells SER in order to process any IMS signals related to the SER. A small number of IMS signals are expected to be required for the SER (less than 20). A Schneider M221 TM221CE40T PLC is proposed to be installed to fulfil this need. It is expected for the contractor to: Conduct a validity assessment of the SER room to determine the best course of action on the following: Determine whether the pre-existing IMS PLC box is suitable for use to house the PLC and any other required terminals. The PLC box currently contains Krone terminals, the preference is to instead remove these and use disconnect terminals, determine the validity of this. It is preferred to use a DC power supply for the PLC, specifically from the local RPS supply. Design and install PLC Hardware, including any required wiring to/from field equipment connections in the SER. Design and Develop PLC software. Develop and rollout new Citect pages for Gosnells SER with all required alarms in accordance with ‘8880-700-854 Infrastructure Monitoring SCADA Functional Specification’. Complete Hardware and functional FAT prior to installation. Full point to point test for all signals, this will require coordination with all other design and construction PTA teams which may influence this project. | Public Transport Authority | $96,680 |
| WA-DPIRD2023154 | eConnnect License Renewal for DOCKER | Department of Primary Industries and Regional Development | $62,858 |
| WA-PTA210009 | The PTA is seeking companies with high capability for services related to Citect and VLC. A summary of services required under this scope include: Group1 Engineering Services: Undertaking design and development activities for the expansion of PTA?s Infrastructure Monitoring SCADA (IMS) to support future growth and business improvements; and Completion of all design and construction work in accordance with applicable PTA standards and functional specifications. Group 2 Maintenance Services: Provision of support services for the maintenance of the PTA?s IMS. This requires the Contractor to provide qualified and suitably experienced personnel to carry out: Group 1 Engineering Services ? Provide decommissioning, commissioning and improvement services to existing Infrastructure. Group 2 Maintenance Services ? Rectifying faulty equipment caused by either breakdowns, usage or damage. | Public Transport Authority | $1 |
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.