arrow_back Supplier Directory
F1
Fortec Australia Pty Ltd 14 Boulder Road, Malaga Perth WA Australia 6090
ABN unknown
Total Won
$97.5M
Contracts
29
Agencies
3
show_chart Government Revenue Over Time
Contract History
| WA-RFPMRWA002721 | Design and construction of bridges over: Tickalara Creek (Bridge No. 1267A); Frog Hollow Creek (Bridge No. 1260A); and Arthur Creek (Bridge No. 1305A), including guidebanks and approach road earthworks. Pre-qualification Required - B2 and F25 Commonwealth Funded Contract that requires compliance with the Code for the Tendering and Performance of Building Work 2016 (Building Code) The Code for the Tendering and Performance of Building Work 2016 (Building Code) applies to the building work associated with this project. By submitting an expression of interest in, or tender for, this project, you will become subject to the Code for the Tendering and Performance of Building Work 2016. Refer to the Building Code at employment.gov.au/building-code for further information Commonwealth Funded Contract that requires compliance with the Australian Govt Building and Construction WHS Accreditation Scheme It is a requirement of this project that any persons contracted to undertake the building work be accredited under the Australian Government Building and Construction WHS Accreditation Scheme established by the Building and Construction (Improving Productivity) Act 2016, at the time of the RFP closing for the building work and while the building work is being carried out. Tenderers intending to submit a bid as a Joint Venture must review the additional requirements as outlined by Section 26(1)(f) of the Fair Work (Building Industry – Accreditation Scheme) Regulations 2016 by the Federal Safety Commission (located at http://www.fsc.gov.au ) | Main Roads Western Australia | $33,314,875 |
| WA-MRWA0098160194 | Bridge 5023B: Close Springdale Road and remove temporary steel pipe crossing and remains of the former bridge structure. The steel pipes are to be cleaned and transported to the Main Roads Ravensthorpe Depot. The pipes are to be off loaded in a location that does not hinder access within this yard. Excavate to the rock foundation, construct abutments Cast and install 18m long planks, cast concrete deck Backfill and construct new approaches to the bridge Install the ¼ tonne rock armour Seal new road and install barrier | Main Roads Western Australia | $6,733,237 |
| WA-MRWA0098160129 | Bridge No. 3019 - Coalseam Road - Bridge Replacement | Main Roads Western Australia | $5,205,032 |
| WA-MRWA0098160225 | Pre-Qualification - BT - Timber Bridge Accreditation The contractor must perform the following work under the Works Order Bridge 562 South Coast Hwy, Jerramungup Bridge 645 Kojonup Pingrup Rd, Kojonup Bridge 4223A Cosy Corner Rd, City of Albany Bridge 4312A Samson Rd, Shire of Kojonup Bridge 4313 Samson Rd, Shire of Kojonup Bridge 4332 Nanarup Rd, City of Albany Bridge 4849 Onslow Rd, Shire of Woodanilling Bridge 5427 Redmond Hay River Rd, City of Albany | Main Roads Western Australia | $4,880,610 |
| WA-MRWA0098160161 | Structure 0835 ? Granary Drive over Ellen Brook ? Bridge Replacement and Temporary Turnaround at Byrne Rd | Main Roads Western Australia | $4,368,693 |
| WA-MRWA0098160230 | Maintenance Works of Structures in the Pilbara Region primarily along Great Northern Highway from approx. SLK 1160 to SLK 1550, including Expansion Joint Seal Replacements, Guardrail Repairs, and other routine maintenance works. | Main Roads Western Australia | $4,221,245 |
| WA-MRWA0098160206 | Demolition of existing structure. Construction of new concrete bridge, as per bridge IFC design drawings/report. Improvements to the existing road network around the bridge to suit the new structure’s geometric alignment. | Main Roads Western Australia | $3,394,868 |
| WA-MRWA0156240001 | Pier Pile Repairs, Abutment Wingwall Sheeting Repairs, Halfcap Repairs and Corbel Replacement to Bridges 0064, 0075A, 0086A, 0102, 0115, 0116, 0273, 0503A, 0549, 0550, 0890, 4332 and 4630 | Main Roads Western Australia | $3,386,553 |
| WA-MRWA0156240005 | Bridge 793 and 794 timber bridge maintenance inclusive of: Repairs and replacement to various superstructure elements such as stringers, bearers, corbels, Halfcaps, decking Repairs and replacement to various substructure elements such as piles, sill beams, wingwall sheeting Overlay replacement Rock protection construction Guardrail extensions | Main Roads Western Australia | $3,263,195 |
| WA-MRWA0098160152 | Structure No 0083 ? South Western Hwy Over Sleeman River ? Bridge Replacement | Main Roads Western Australia | $2,748,502 |
| WA-MRWA0098160154 | Stirling Hwy and Karel Ave Amenity Walls | Main Roads Western Australia | $2,463,010 |
| WA-MRWA0098160173 | Structure No 4016 ? Quill Rd over Arthur River ? Bridge Refurbishment | Main Roads Western Australia | $2,404,262 |
| WA-MRWA0098160219 | Substructure, superstructure and associated works – Structure 0637 | Main Roads Western Australia | $2,328,988 |
| WA-MRWA0098160187 | Bridges 1324 & 1499: Replace Protective coating on LHS and RHS Guard railing Replace Protective coating to Bridge Bearings on Abutments and Piers. Replace Protective coating on Bridge 1324 Expansion Joint 2 (Western End). Expansion Joint 2 (Western End) Crack Repair and Bolt Tightening. Expansion Joint Compression Seal Replacement at Bridge 1324 Abutment 1 (Western End). Expansion Joint Replacement at Bridge 1499 Abutment 2 (Eastern End). Anchorage Cap Replacement. Rock Protection Repair to Abutment 2. Installation of Anti Dust Skirts to Pier Bearings. Cleaning of PSP lighting. Concrete Patch Repair | Main Roads Western Australia | $2,144,886 |
| WA-MRWA0098160257 | Repairs to Bridge 0831- Morawa Road SLK 2.05 - Shire of Mingenew - Midwest Gascoyne Region Bridge barrier replacement, transverse joint replacements, miscellaneous repairs after traffic incident. | Main Roads Western Australia | $1,775,338 |
| WA-PTA250085 | Background The Public Transport Authority (PTA) is initiating a safety enhancement project for the William Street (Horseshoe) Bridge and Barrack Street Bridge, located at either end of Perth Train Station. These bridges span multiple electrified railway lines and have been the site of repeated safety incidents, including trespassing and the throwing of objects into the rail corridor. These incidents pose serious risks to public safety and cause significant operational disruptions. Both bridges are heritage-listed structures, and any modifications must be undertaken with sensitivity to their historical and architectural significance. The proposed works have been designed to preserve the heritage value of the bridges while addressing critical safety concerns. To mitigate these risks, PTA has resolved to install protective screening on both bridges. A preferred design solution has been selected, involving X-Tend mesh screens with profiled outward angled structural posts inside of the existing bridge balustrade. The design minimizes visual impact through colour-matching with the bridge surroundings and complies with heritage requirements. The protection screens are expected to: Reduce incidents of trespass and object throwing; Enhance safety for the public and rail staff; Improve service reliability; Protect critical infrastructure; and Align with PTA’s broader safety and risk mitigation strategies. This Request invites qualified contractors to submit proposals for the supply, fabrication, and installation of the protection screens for William and Barack Bridges in accordance with the approved design documentation. The contract must also comply with all relevant heritage, planning, and authority requirements, including coordination with applicable regulatory bodies. Scope of Works The overall scope includes, but is not limited to, the following: Preparation of required Project Management Plans; Conduct a dilapidation survey of surrounding infrastructure and assets prior to the commencement of works; Implement all required temporary works, including traffic and pedestrian management measures and access provisions; Relocate, protect, and reinstate existing services where conflicts with the proposed works are identified; Execute all construction activities in accordance with the approved detailed design, ensuring no disruption to normal train operations and maintaining the safety of the public, commuters, and workers at all times; Reinstate the footpath and associated bridge structures as part of the works, ensuring no damage to existing elements, including but not limited to balustrades, soffits, and surrounding infrastructure; and Carry out all works in accordance with relevant standards, preserving the integrity of existing structures and complying with all applicable regulatory, heritage, and operational requirements. The scope includes two separable portions (SP) including; SP1 - William St Bridge; and SP2 – Barak St Bridge. For further details of the scope of works, refer to PTA250085 - AS4000 (Book4) RFT Scope of Works. | Public Transport Authority | $1,721,968 |
| WA-MRWA0098160181 | Kimberley Region Various Structures - Great Northern Highway ? Superstructure Maintenance: Expansion Joint Replacement Approach Slab Replacement Minor Repairs | Main Roads Western Australia | $1,685,054 |
| WA-MRWA0098160218 | Substructure and superstructure repair works – Structures 0655, 0666, 0668 and 0782 | Main Roads Western Australia | $1,460,264 |
| WA-MRWA0098160108 | Widening Bridge 4942 to accommodate 2 lanes of traffic ? widening from 4.2m width between kerbs to 8.6m width. | Main Roads Western Australia | $1,448,516 |
| WA-MRWA0098160239 | Repair and Maintenance including concrete crack repairs, spalled concrete repairs, expansion joint seal replacement, corrosion treatment, end grain sealing and stringer and corbel bolting, packing, repair and replacement. | Main Roads Western Australia | $1,328,836 |
| WA-DBCA404WT042021 | The Department is seeking the services of a suitably qualified Respondent for the design and construction of a suspension bridge over the Collie River in Collie State Forest. | Department of Biodiversity, Conservation and Attractions | $1,284,940 |
| WA-MRWA0098160111 | Fabrication and erection of 11 gantry structures on Tonkin, Mitchell Fwy and Orrong Rd. S alvage eight structures on Tonkin Hwy. | Main Roads Western Australia | $1,240,978 |
| WA-MRWA0156240011 | Structural repairs including pile pots, stringer replacement, half cap replacement, sheeting repairs and corbel replacement. Pre-qualification Required - BT | Main Roads Western Australia | $1,082,579 |
| WA-MRWA0156240009 | Concrete repairs – cracks and spalling, reinstate coatings to abutments and wingwalls, seal road surface cracks, repair rock pitching, replace expansion joint seals Prequalification: B1 | Main Roads Western Australia | $964,203 |
| WA-MRWA0098160083 | Vegetation removal from waterways. Tightening/replacing nuts and bolts. Brace tightening. Spoon drain construction. Kerb extension. Concrete spalling and crack repair. Guardrail and end terminal installation. Replacing deck joint seals. Epoxy application. Road seal SL application. Grout application. Scupper extensions. Sealant application. | Main Roads Western Australia | $744,147 |
| WA-MRWA0156240008 | Stringer packing and bolting, abutment pile banding and timber sheeting repair, corbel packing, replacement and repair, pier half cap replacement, pier pile packing, banding and bolt replacement, gap filling at abutment sill beams. Pre-qualification: BT | Main Roads Western Australia | $638,324 |
| WA-MRWA0098160237 | Removal and disposal of existing Bridge guardrails, Installation of new TL3 on-bridge barriers & end terminals on both sides to both bridge approaches & guardrail extension works. | Main Roads Western Australia | $596,733 |
| WA-MRWA0098160179 | Replacement of toprail end treatment, corrosion treatment of tie bolts, pile encasement repairs and replacement of expansion joint seal. | Main Roads Western Australia | $549,970 |
| WA-MRWA0098160259 | Provision of Repair Works of Bridge Structure 0752 - Repairs works to approach slab | Main Roads Western Australia | $158,640 |