arrow_back Supplier Directory
T
Techworks Group (Techworks Electrical Pty Ltd)
ABN unknown
Total Won
$6.6M
Contracts
20
Agencies
5
show_chart Government Revenue Over Time
Contract History
| WA-PTA200113 | The solar Photovoltaic (PV) Contractor shall design, supply, deliver, install, test, commission and maintain the system, which shall be complete with all necessary ancillary and minor items to facilitate the correct completion of the work. This shall also apply to all requirements of relevant standards and/or authorities having jurisdiction over these works. | Public Transport Authority | $2,965,018 |
| WA-24RAC42 | RAC Arena Hot Water System | VenuesWest | $510,725 |
| WA-PTA05 | Programmed Facility Management Pty Ltd (PFM) on behalf of Public Transport Authority (PTA) for Transperth are seeking Tenders from suitably qualified and experienced contractors to undertake Fire Installation and Upgrades Works at Busselton Bus Depot. Design and construct the below Hydrant, Hose Reel, Booster Cabinet, Pump and Tank system to achieve compliance as per attached IFT design and specification document. Wet fire Hydrant System: Refer attachments provided, Issue for Tender design and specification documentation prepared by Lucid Consulting Australia, refer section 2.7 page 9 for detail scope of works. In addition, contractors are to supply and install the below items to achieve compliance as per attached report document. Wet fire Portable Extinguishers: Supply and install 1 x 9kg Foam type extinguishers with sign and mounting bracket within Workshop area. Dry fire Emergency Lighting: Provide additional emergency lighting along pathways towards required exits within Office area. | Programmed Facility Management | $488,723 |
| WA-WE19022024MYR06ACT | The Arts and Culture Trust (ACT) requires a suitable Contractor for the provision of the installation of house lighting at the ACT managed His Majesty’s Theatre. | Arts and Culture Trust | $416,938 |
| WA-PTA09 | Programmed Facility Management Pty Ltd (PFM) on behalf of Public Transport Authority (PTA) for Transperth are seeking Tenders from suitably qualified and experienced contractors to undertake upgrade works of the BSMSB to allow for future Electric Bus (EB) charging station infrastructure to be installed at Elizabeth Quay Bus Station. The works are limited to the supply, installation & commissioning of a new BSMSB. The design has been completed by Norman, Disney & Young (NDY) and will be issued ?for construction following award of the contract. A new switchroom to house the new BSMSB will be required as part of these works. The design of the switchroom will fall under this contract and includes all necessary services. | Programmed Facility Management | $359,127 |
| WA-E19022024MYR09HMTACT | To establish a Contract for the provision of installation of Theatrical Lighting Dimming and Power Distribution (Works) at the Arts and Culture Trust (ACT) managed His Majesty's Theatre (HMT). | Arts and Culture Trust | $274,935 |
| WA-23074145DLGSC | This contract is for procurement of remediation work required to install Wi-Fi and LAN services for WA Museum and Arts & Culture Trust metro sites. This purchase will upgrade current structured cabling to the specification required for the installation of network equipment purchased under the GovNext - ICT Infrastructure contract for Cultural Statutory Authorities. | (inactive) Department of Local Government, Sport and Cultural Industries | $202,551 |
| WA-E19022024MYR09SACACT | To establish a Contract for the provision of installation of Theatrical Lighting Dimming and Power Distribution (Works) at the Arts and Culture Trust (ACT) managed Subiaco Arts Centre (SAC). | Arts and Culture Trust | $202,548 |
| WA-RFQWA7789759 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Training and Workforce Development (DTWD) are seeking quotes from suitably qualified and experienced contractors to undertake Replace Emergency and Exit Lighting System at NMTAFE Perth Building 2. The Work includes but is not limited to the supply, installation, testing, commissioning, maintenance and defects liability service of materials, labour and equipment for the complete Electrical Services installations detailed in the Annexure 1 and 2. The scope of works in summary, is to remove and replace with new the existing emergency and exit lighting system throughout the entirety of Building 2. | Programmed Facility Management | $166,850 |
| WA-WA6021579 | Programmed Facility Management Pty Ltd (PFM) on behalf of Public Transport Authority (PTA) for Transperth are seeking Quotes from suitably qualified and experienced contractors to undertake Stormwater Containment and Disposal Works at the Busselton Bus Depot The objective of this project is to retain stormwater run-off from the large hardstand used for bus parking. Site contour causes surface water to traverse towards the northwest corner of site and into an area of vegetation which is used for onsite disposal of treated wastewater. This causes local flooding which carries treated wastewater outside of the disposal field and into the council verge. Design and construct onsite stormwater containment and subsurface disposal system. | Programmed Facility Management | $144,069 |
| WA-RFQWA6256224 | Programmed Facility Management Pty Ltd (PFM) on behalf of department of Finance (DOF) and Department of Education (DOE) are seeking quotes from suitably qualified and experienced contractors to undertake Leach Drainage Works at Eastern Hills Senior High School. New additional drainage cells to be installed in an inverted style to allow for additional sewerage use and linked to existing system, complete with pumping station and alarm system. Purpose for these works is to reduce saturation and flooding with rain and effluent during winter months outside main entrance and music building. | Programmed Facility Management | $133,901 |
| WA-PTA240054 | The Public Transport Authority (PTA) requires upgrades to low voltage (LV) power supply infrastructure at multiple locations across the PTA Network to support the installation of the digital radio system. The purpose of this project is to complete these upgrades, addressing ageing and future infrastructure requirements and to prepare for the new digital radio system that will be delivered by the Radio System Replacement (RSR) project. | Public Transport Authority | $123,353 |
| WA-RFQWA9074566 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake electrical upgrade at Burrendah Primary School. The Work includes but is not limited to site preparation, demolition works, cabling, supply of new SMSB, making good, and other associated works as required. | Programmed Facility Management | $110,031 |
| WA-RFQWA9392374 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake the design, supply, delivery to site, storing and installation and testing of the Electrical Services systems as listed in the Annexure 1 – Scope and Specifications. All work shall comply with the requirements of the relevant authorities, Australian Standards and any additional performance requirements outlined within this document: Works are to be completed at Kinross Primary School Tuart Block located at 64 Kinross Dr, Kinross, Western Australia, 6028. The Work includes but is not limited to demolition, supply and installation, testing and commissioning of the following: Mobilisation and Site establishment Provide switchboard shop drawings within two weeks of appointment. Provide a dilapidation report, 4 weeks prior to any works on site, including continuity and mega test on the existing electrical services being re-used. Submission of programme of works (for approval by the Superintendent) including schedules for anticipated power shutdowns. The electrical work shall be scheduled to take place during the school holidays. Removal and disposal of demolition, redundant materials, cabling and equipment from works undertaken to complete the installation. Labelling and identification. Installation, Testing and Commissioning. Provide performance guarantees and certification for the new works. Provide 12 months defects liability period. Provide maintenance of all equipment and systems provided under this contract for the duration of the defects liability period of twelve (12) months. Provide a 24 hour “call out service” for all equipment and systems provided under this contract for the duration of the defects liability period of twelve (12) months. Supply three (3) copies of as-installed drawings Supply three (3) copies of Operating and Manuals on completion of the site works. Allow to arrange and pay for the isolation and reinstatement of the buildings fire protection systems for the completion of any hot works or penetration works. The electrical services contractor to obtain approval from the base building management on completion of the project and to rectify any defects. Provision of all required cable support systems for the existing and new electrical, data and communications services cables. | Programmed Facility Management | $89,306 |
| WA-RFQWA8212085 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake Power Upgrade at Fremantle College. The Work includes but is not limited to Deliver power upgrade works as per Annexure 1 ? Scope and Specification. | Programmed Facility Management | $82,345 |
| WA-WE28032024ACT | The Arts and Culture Trust (ACT) is seeking a suitable experienced and qualified contractor for the provision of installation of lighting for the bronze box at the ACT managed State Theatre Centre. | Arts and Culture Trust | $77,336 |
| WA-RFQPRO10923 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake supply and install of Switchboards at Quinns Rocks Primary School. The Work includes but is not limited to the Design, Supply and Install, and Testing and Commissioning of 3 x Switchboards to DoE Specifications. | Programmed Facility Management | $74,078 |
| WA-RFQWA7998904 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Justice (DOJ) are seeking quotes from suitably qualified and experienced contractors to undertake Space Heater Removal at Banksia Hill Juvenile Detention Centre. The Work includes but is not limited to Removal of a total of 27 large heaters and 8 small heaters for a total of 35 through Karakin, Lenard, Urquhart,Murchison, Teeda and Edvoc 1. | Programmed Facility Management | $71,421 |
| WA-RFQWA8755117 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake electrical upgrade at Poseidon Primary School. The Work includes but is not limited to the upgrade of main electrical switchboard, and repairs to all associated sub-mains. | Programmed Facility Management | $53,867 |
| WA-P22033B | HBF Stadium MSB1 Replace Circuit Breaker | VenuesWest | $42,818 |
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.