arrow_back Supplier Directory
G1
Garli Pty Ltd 117 Great Eastern Highway Rivervale WA Australia 6103
ABN unknown
Total Won
$156.2M
Contracts
30
Agencies
3
show_chart Government Revenue Over Time
Contract History
| WA-MRWA000124 | Construction of Manuwarra Red Dog Highway Stage 4A 1 - Pilbara Region Prequalifications required - R1 & B1 It is a requirement of this project that the builder/s contracted to undertake the building work be accredited under the Work Health and Safety Accreditation Scheme, established under the Federal Safety Commissioner Act 2022, at the time of entering into the contract for the building work and while the building work is being carried out.* The builder/s must comply with all conditions of Scheme accreditation. * Paragraph 26(g) of the Federal Safety Commissioner (Accreditation Scheme) Amendment Rules 2023 outlines provisions applying to joint venture arrangements that include accredited and unaccredited builders. | Main Roads Western Australia | $54,450,000 |
| WA-MRWA023021 | Construction of Great Northern Highway between 103.8 and 110.2 SLK, including earthworks, drainage, pavement construction and sealing. | Main Roads Western Australia | $38,158,545 |
| WA-MRWA016521 | The Metropolitan Region is planning to carryout various Minor Capital Works for road and bridge works, with each package of work being value at under $5 Million, following the expiry of the Metropolitan Network Contract in 2023 | Main Roads Western Australia | $20,000,000 |
| WA-MRWA0165210019 | Widening of Shoulder and Barrier Installation Roe Highway - Metropolitan Region - SLK 14.86 to SLK 19.55 Construct shoulders and install barriers on Roe Highway between South St and Nicholson Rd | Main Roads Western Australia | $4,655,855 |
| WA-MRWA0165210017 | Shoulder widening – Great Eastern Highway (H005) between SLK 48.5 to SLK 51.8. Pavement Repair – Great Eastern Highway (H005) between SLK 48.5 to SLK 51.8. Resurfacing the existing trafficable lanes, and newly reconditioned shoulder. Reinstate batters, around driveways, and drains ensuring that no edge drop remains, and water flows. Installation of audible edge line and audible centre line markings. Reinstate any signs, guideposts and line marking removed during the execution of work. | Main Roads Western Australia | $4,028,558 |
| WA-MRWA0165210001 | Median shoulder widening and safety barrier install between Kenwick Link and Orrong Rd and median shoulder widening and pier protection installation at Willeri Dr, Nicholson Dr, Kenwick Link, Albany Hwy and Brixton St bridges. | Main Roads Western Australia | $3,998,145 |
| WA-MRWA004420 | The Scope of Works comprises the upgrade of several existing roads on the MRWA and Town of Port Hedland network to accommodate the truck movements required for construction of the Port Hedland Spoilbank Marina | Main Roads Western Australia | $3,873,523 |
| WA-MRWA0165210024 | Provision of bus lane at Scarborough Beach Rd and West Coast Hwy intersection Creation of two bus embayments on West Coast Hwy The above is to facilitate additional bus movements in the area predicted due to the commencement of the ‘SurfCat’ from 30 November 2025 | Main Roads Western Australia | $2,645,522 |
| WA-FINW0013624 | Department of Education - New Primary School for Alkimos - Forward Works. A non-mandatory site inspection and/or tender briefing will be held on Wednesday, 27 November 2024 at 2:00 pm. To confirm attendance at this briefing, you must contact Tony Cosentino on (08) 94230000 or by email tony@tz.com.au. | (inactive) Department of Finance | $2,324,362 |
| WA-MRWA0165210018 | Shoulder Grading and Reconditioning , Melville Mandurah Highway and South Western Highway- Metropolitan | Main Roads Western Australia | $2,176,585 |
| WA-MRWA0165210027 | Construction of a new left turn slip lane from Mitchell Freeway northbound off ramp to Neerabup Road westbound. Works include drainage, barriers, pedestrian facilities, signage and pavement marking, etc. | Main Roads Western Australia | $1,729,045 |
| WA-MRWA0165210009 | Construction of Ennis Avenue and Dixon Road Modifications | Main Roads Western Australia | $1,709,822 |
| WA-MRWA0165210010 | Shoulder widening - Cockburn Road (H025) between SLK 0 to SLK 9.81. Reinstate batters, around driveways, and drains ensuring that no edge drop remains, and water flows. Reinstate any signs, guideposts and line marking removed during the execution of work. | Main Roads Western Australia | $1,700,096 |
| WA-MRWA0165210007 | Construction of a raised island in the intersection of Morley Hwy and Constance Street and provision of a U-turn facility east of the intersection between Jason St and Hillsborough Drive. | Main Roads Western Australia | $1,673,063 |
| WA-MRWA0165210025 | Construction of Albany Hwy/Nicholson Road and Liege Street Intersection by extending Albany Highway Right Turn Pocket to Nicholson Road and By extending Albany Highway Right Turn Pocket to Liege Street. SLK 9.15 to 9.78. | Main Roads Western Australia | $1,594,720 |
| WA-MRWA0165210020 | Removal of the right turn out from Corinthian Rd East to Leach Hwy in Shelley. Pedestrian improvements. | Main Roads Western Australia | $1,523,084 |
| WA-PTA220090 | The Scope of the project is the design and construction of the Bennett Springs Access Road between Dulwich St and Cheltenham St, including all accommodation works associated with the construction of the access road. | Public Transport Authority | $1,498,709 |
| WA-MRWA0165210008 | Construction of civil works, associated with Cockburn Road signalised pedestrian crossing by: Constructing left-turn-slip-lane from Cockburn northbound to Powell Road, Widening existing median, Lowering eastern-side footpath to pedestrian ramp Replacing kerbs Replacing and extending footpaths. During construction period contractor shall provide traffic management and construction support to Telstra and ATCO-Gas, to lower/protect their cables/pipes/pits. Dates of mobilisation will be provided to Tenderer before closing date of the tender. Include Service-provider working-days into Contractors Construction Program. Refer Package of Work (Page 6), BOQ, Program Schedule (Page 21) and Sketches for descriptions of the work provided by Telstra and ATCO-Gas. Signalising contractor Venture-Smart had already completed of their works. | Main Roads Western Australia | $1,129,862 |
| WA-MRWA0165210003 | Construction of Kwinana Freeway Principal Shared Path between South Street to Farrington Road. Works include profiling out the existing path, reinstating with a new alignment, and construction of ancillary works. | Main Roads Western Australia | $1,009,463 |
| WA-FINW0207324 | Department of Education - Henley Brook Primary School - Splendour Avenue Road Extension. | (inactive) Department of Finance | $968,173 |
| WA-MRWA0165210002 | Construction of Mitchell Freeway Principal Shared Path between Vincent Street and Loftus Street. Works include profiling out the existing path, reinstating with a new alignment, and construction of ancillary works and tree removal. | Main Roads Western Australia | $866,333 |
| WA-MRWA022621 | Complete fencing works for Bindoon North project on Great Northern Highway Commonwealth Funded Contract that requires compliance with the Australian Govt Building and Construction WHS Accreditation It is a requirement of this project that any persons contracted to undertake the building work be accredited under the Australian Government Building and Construction WHS Accreditation Scheme established by the Building and Construction (Improving Productivity) Act 2016, at the time of the tender closing for the building work and while the building work is being carried out. Tenderers intending to submit a bid as a Joint Venture must review the additional requirements as outlined by Section 26(1)(f) of the Fair Work (Building Industry – Accreditation Scheme) Regulations 2016 by the Federal Safety Commission (located at http://www.fsc.gov.au ) | Main Roads Western Australia | $745,783 |
| WA-MRWA0165210012 | Construction of Drainage Line to Divert Storm Water from Canning Hwy (H013) SLK 5.25 to McDougall Street, South Perth | Main Roads Western Australia | $732,078 |
| WA-MRWA0165210016 | Construction of Albany Highway & Station Street Intersection Modifications including turning pocket closureConstruction of Albany Highway & Station Street Intersection Modifications including turning pocket closure | Main Roads Western Australia | $730,335 |
| WA-MRWA0165210023 | The scope of work includes earthworks, drainage installation, pavement, bituminous surfacing, and traffic facilities as outlined in the design drawings. Key tasks involve preparing traffic management plans, identifying and protecting existing services on-site, and installing five new combination pits. The drainage system will include the installation of approximately 10m of 450mm class 2 RCP and 18m of 600mm class 2 RCP, with measures to repair or reinstate any impacted W-beam safety barriers. The work will ensure drainage pipes are properly positioned, avoiding clashes with W-beam posts. Pavement, surfacing, and kerbing will be reinstated where needed, and all works will comply with Main Roads Standards. | Main Roads Western Australia | $507,198 |
| WA-MRWA0165210015 | Provision of clearing works for the Wanneroo Road Duplication Project | Main Roads Western Australia | $499,661 |
| WA-MRWA0165210013 | Widen existing path to 3.3m (1.5m lanes and 0.15m shoulders) wide sealed path for a total length of 250m Repair any areas of tree root damage along the PSP, using a profile and replace method. Apply root barrier system, where required. Box out widening areas 100mm deep, compact and water subgrade surface. Dispose of boxed out material. Apply 100m of Asphalt Intermediate Mix or RAP to widening area, ensure widening continues at existing surface level. Apply SAMI seal for full PSP width, over existing asphalt and asphalt widening. Apply 30mm of Red 10mm DGA for full PSP width. | Main Roads Western Australia | $429,653 |
| WA-MRWA0165210014 | Planting tube stocks and implementing weed management program on 41,320 sqm site at Great Eastern Highway (H005), Wooroloo. | Main Roads Western Australia | $322,732 |
| WA-MRWA022521 | Provision of landscaping services for the Bindoon North Project, Great Northern Highway SLK 94.00 to SLK 101.80. | Main Roads Western Australia | $280,865 |
| WA-MRWA0165210022 | Construction of raised pedestrian wombat crossing on Bulwer St (SLK0.6 to 0.7) Installation of ACO Slab drain on northern verge Installation of signs and line marking Kerbing and brick paving of median island Excavation and installation of signal conduits | Main Roads Western Australia | $280,135 |
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.