arrow_back Supplier Directory
F2
Freyssinet Australia Pty Ltd 28 Division Street Welshpool WA Australia 6106
ABN unknown
Total Won
$14.9M
Contracts
11
Agencies
6
show_chart Government Revenue Over Time
Contract History
| WA-MRWA0098160208 | Maritana Bridges - Structure No. 0962 & 0965 over Rail, Bridge refurbishment works. | Main Roads Western Australia | $5,032,871 |
| WA-MRWA0098160215 | Substructure and Superstructure Works to Bridges 3617, 4501 and 5000 To explore potential substantial cost savings in the repair expenses for Bridge 4501, the tender must include pricing details for two options, outlined below: • Option 1: Pier pile replacement • Option 2: Pier pile repairs | Main Roads Western Australia | $3,218,914 |
| WA-PTA230093 | Background The Civil Branch of the Public Transport Authority (PTA) is seeking a highly experienced and capable organisation to provide marine diving and vessel management solutions to assist with the maintenance of its underwater bridge structures. As the PTA is responsible for maintaining the safety and function of these bridges, as well as the rail reserve, tunnels, and associated infrastructure, the organisation will also be required to provide ongoing bridge infrastructure cathodic protection services, conduct maintenance and inspection, and provide scour control around rail bridges. The Fremantle Rail Bridge is the only structure with cathodic protection equipment installed. PTA may expand the number of structures requiring these services to include others within the metropolitan and/or regional areas in future. Previously these services have been covered under two separate contracts; PTA2015029 – Tender – The Provision of Bridge Infrastructure Cathodic Protection Services for The Public Transport Authority, and PTA170771 – Quote – Marine Divers and Vessel Services Upon review of these contracts, it was determined it would be more beneficial to the PTA to merge these two contracts into one, due to the marine diving portion is better suited to be managed by the successful Tenderer responsible for the bridge works. Scope of Services and Specification The successful Tenderer will be required to provide the following services: Standard Services a) Impressed Current Cathodic Protection (ICCP) once every six months inspection & report on PTA Bridge structures. Appendix A includes details of the types and frequency of maintenance required. b) ICCP Refurbishment & maintenance of existing systems on PTA Bridge Structures/Assets. c) Concrete condition/integrity assessment auditing & reporting. d) Concrete refurbishment to reinstate PTA Structure/Asset integrity. e) Minor repair and maintenance to the protective coating systems on PTA Structures/Assets as required for small tor the purpose of clarity, the Contractor is not responsible for the significant painting of the entire bridge structure. In the event that major painting is required, the work would be procured through a separate competitive quote/tender process. f) Provision of ROV (Remotely Operated Vehicle) and operator for annual assessment auditing & reporting of immersed steel support piles of PTA Structures/Assets. The ROV must be capable of capturing High-Definition video images. g) Spotter/rescue vessel & operators for Bridge work over marine locations as required. h) Provision of condition assessments as per clauses 3.2.4 to 3.2.14.8 of AS 5100.8:2017 Bridge design - Rehabilitation and strengthening of existing bridges. i) Provision of CP assessment and maintenance. As per Clause 3.3 & Appendix B of 5100.8:2017 Bridge design - Rehabilitation and strengthening of existing bridges. The only access to the underside of the bridge is by boat. Scaffolding will be required for all work undertaken at height. Underwater Services The successful Tenderer may be required to provide the following services: a) In any instances where the ROV cannot precisely determine a suspect underwater issue, the Contractor shall utilise underwater divers when required. The Contractor will define the scope of their role, which typically includes visual inspection, collection of samples etc. b) Simple repairs/remedies and all other measures supporting a solution. c) Diving services for inspection, including high-pressure cleaning of support piles. d) Provision of Non-Destructive Testing (NDT) Ultrasonic Thickness Testing. e) Provision of wrapping/sleeving services to steel/timber support piles based on supplied specifications. f) Provision of Scour condition assessment, maintenance, and monitoring. General overview provided within PTA document 8803-450-001 - Guideline - Underwater Marine - Hydrodynamic Scour Prevention and Management Deliverable • Surface and subsurface bed material of waterway including the vegetation and accumulation of the debris for each all the components of the bridge; for the approach section and contracted section • Foundation depth and foundation type • Pier dimension and orientation • Abutment - Location of abutments relative to the main channel • Depth, velocity, and alignment of flow through the constriction/bridge components • slope and alignment of the natural stream including the depth of the main waterway channel bed depicting the flow direction, flow paths, flow contraction and expansion through bridge In performing any of the activities as nominated above, the Diving Contractor shall be responsible for providing all manpower, diving support vessels, tools and equipment necessary to execute the works. All diving works must comply with AS/NZS: 2299.1.2015 Occupational Diving Operations. Prior to inspection of piles, the Contractor will require a marine vessel management plan approved by PTA and the Fremantle Port Authority. | Public Transport Authority | $2,750,000 |
| WA-MRWA0098160221 | Maintenance of Bridge Structures No. 127, 1223, 1226, 9002B, 9034 & 9048 - Metropolitan | Main Roads Western Australia | $1,053,842 |
| WA-MRWA0098160238 | Bridge 1030: Corrosion Treatment to Bearings Inject cracks at Girder from Pier 3 to Pier 4 Inject cracks at Piers Apply protective sealing Strengthening of Piers 4 & 5 | Main Roads Western Australia | $987,617 |
| WA-MRWA0098160124 | Structure No. 1367, 1368, and 1369 - Pile Repair and Cathodic Protection | Main Roads Western Australia | $454,471 |
| WA-DBCABGPA20092020 | Repair and recoating of DNA Tower, Kings Park | Botanic Gardens and Parks Authority | $371,003 |
| WA-DWER200822 | Remedial and Upgrade Works at Five (5) Discharge Measurement Structures in the South West | Department of Water and Environmental Regulation | $342,459 |
| WA-DHW0094925 | Department of Creative Industries, Tourism and Sport - WA Museum of the Goldfields - Headframe Remediation Works. | Department of Housing and Works | $325,820 |
| WA-MRWA027024 | Bridge 0914 (Causeway Bridge) Hydro Demolition Works - Repair deteriorated concrete pilasters on the heritage-listed Causeway Bridge to maintain structural aesthetics integrity and safety. | Main Roads Western Australia | $242,000 |
| WA-RFQWA3798589 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education (DOE) are seeking quotes from suitably qualified and experienced contractors to undertake Concrete Repairs at John Curtin College of the Arts. | Programmed Facility Management | $118,167 |
Agency Relationships
Main Roads Western Australia
$11.0M
6 contracts
Public Transport Authority
$2.8M
1 contracts
Botanic Gardens and Parks Authority
$371.0K
1 contracts
Department of Water and Environmental Regulation
$342.5K
1 contracts
Department of Housing and Works
$325.8K
1 contracts
Programmed Facility Management
$118.2K
1 contracts
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.