arrow_back Supplier Directory
GA
GHD-Aurecon Joint Venture 999 Hay Street PERTH WA Australia 6000
ABN unknown
Total Won
$17.5M
Contracts
86
Agencies
1
show_chart Government Revenue Over Time
Contract History
| WA-PTA210652 | Bellevue Depot Project Track Engineering Panel | Public Transport Authority | $738,685 |
| WA-PTA251169 | The Public Transport Authority (PTA) is responsible for ensuring the safety, reliability, and performance of rail bridges, underpasses, and associated structures across the metropolitan rail network. To meet these obligations, PTA requires ad-hoc engineering assessments to confirm asset capacity and suitability for current and future rail vehicle operations.PTA seeks the services of a suitably qualified consultant with proven expertise in bridge and structural engineering to provide independent, on a request basis support. | Public Transport Authority | $688,492 |
| WA-PTA230341 | The PTA requires the services of a consultant with an appropriately skilled and capable team to progress with the next stage of planning and design for the Shenton Park station major upgrade project. | Public Transport Authority | $647,832 |
| WA-PTA250239 | Services of a consultant to undertake a reference design and cost estimation for the replacement of protection screens on the existing structures in accordance with the Public Transport specification requirements. | Public Transport Authority | $501,107 |
| WA-PTA210230 | Load Rating of Existing Rail Bridge and Underpass Structures - Package D | Public Transport Authority | $495,165 |
| WA-PTA201005 | Design works for additional stabling roads at Nowergup Depot including reference design and associated reports detailed design and associated reports, IFC, technical advice and as constructed drawings. | Public Transport Authority | $494,504 |
| WA-PTA240244 | Upon commissioning of the Morley-Ellenbrook rail line, the PTA intends to utilise turnback infrastructure at Daglish station to turn services on the Fremantle line. While tracks, switches and signalling system are in place to execute turnback operations, further improvements are identified to incorporate Daglish turnback facility into long-term service operations. | Public Transport Authority | $493,780 |
| WA-PTA250893 | The PTA seeks the services of a qualified and experienced engineering design consultant | Public Transport Authority | $448,901 |
| WA-PTA230483 | PTA requires validation of the loading capacity of existing rail infrastructure via conducting the load rating assessment as per the latest Australian Standard AS5100 series for the following rail bridges and underpasses mentioned in Table 1 below. Hence, PTA seeks a qualified and experienced consultant to undertake these works. Table 1 below outlines the assets required to be load assessed. Asset No. | Public Transport Authority | $418,580 |
| WA-PTA201051 | Inspection of all PTA-owned culverts on the Midland and Joondalup lines and load rating of select culverts based on priority risk assessment. | Public Transport Authority | $401,689 |
| WA-PTA190580 | The PTA is seeking to appoint suitably qualified and experienced Project Engineer’s for the Bellevue Depot project in the following Facilities & Infrastructure Engineering Disciplines: Stations & Buildings Project Engineer Low Voltage (LV) Project Engineer Fire, Protection, Detection, Safety Project Engineer Mechanical Project Engineer Hydraulics Project Engineer | Public Transport Authority | $396,000 |
| WA-PTA190887 | Track & Electrification Engineers - BST | Public Transport Authority | $393,965 |
| WA-PTA240553 | The Public Transport Authority (PTA) is seeking the services of a suitably qualified and experienced consultant to undertake Detailed Visual Inspections (Level 2 Inspections) for station footbridges and underpasses on the Perth Urban Rail Network. The inspections are routine and cyclic in nature. They are carried out to assess the asset condition and detect any signs of distress or deterioration that may pose a safety risk. Early detection can also reduce the rate of deterioration. The findings of these inspections can be used to determine the requirements of routine repairs and major periodic maintenance activities. The goal of the assignment is to enable PTA to ensure structural integrity of these structures and contribute to the delivery of Rail Safety and On-Time-Running (OTR) Reliability requirements expected of PTA. | Public Transport Authority | $360,653 |
| WA-PTA200603A | Project Engineers, Civil Engineering | Public Transport Authority | $349,800 |
| WA-PTA200964 | North Fremantle Station (Down Main) Pedestrian Crossing Relocation - Detailed Design | Public Transport Authority | $342,005 |
| WA-PTA190581B | The PTA is seeking to appoint suitably qualified and experienced Project Engineer?s for the Bellevue Depot project in the following Civil Engineering Disciplines: Civil Engineering Project Engineer Structures Project Engineer Geotechnical Project Engineer Roads, Drainage & Services Project Engineer Earthworks Project Engineer | Public Transport Authority | $297,000 |
| WA-PTA190782 | Third Party Access Assessment - TCL | Public Transport Authority | $289,014 |
| WA-PTA220577 | Provision of Project Engineers for City of Joondalup - Shenton Avenue Rail Tunnel Extension Project | Public Transport Authority | $275,000 |
| WA-PTA190890A | Operational Technology Project Engineer - TCL/YRE | Public Transport Authority | $273,187 |
| WA-PTA190916A | Building Services Project Engineers Fire and Hydraulics | Public Transport Authority | $271,013 |
| WA-PTA190784 | The Consultant shall assist the PTA Major Projects Unit (MPU) Project Civil Engineering Manager in the delivery of the MPU projects. The Consultant will be allocated to the MPU project identified (or more than one if multiple projects are included in the table above). Others have been, or will be, engaged to focus on other areas of other disciplines and the Consultant will work closely with other resources within PTA to offer technical expertise in the allocated discipline. The Scope of the Consultancy includes the following services: Preparation of Scope of Works and Technical Criteria (SWTC) for the Kenwick Rail Freight Facility Design and Construction tender review and advice Design review | Public Transport Authority | $257,731 |
| WA-PTA230330 | Concept Design for Nowergup Depot Future Maintenance Facility | Public Transport Authority | $249,714 |
| WA-PTA104342 | Concept Design for Nowergup Depot Future Maintenance Facility | Public Transport Authority | $249,713 |
| WA-PTA210559 | Electrical Engineering - Electromagnetic Compatibility and Earthing & Bonding Project Engineer - Bayswater Station and Turnback Project | Public Transport Authority | $247,992 |
| WA-PTA200399 | Civil Maintenance - Civil/Structural Engineers | Public Transport Authority | $247,500 |
| WA-PTA190734 | Low Voltage Critical Supplies - Cannington Standalone Equipment Room | Public Transport Authority | $246,893 |
| WA-PTA200604 | Track Project Engineer for the Bellevue | Public Transport Authority | $242,000 |
| WA-PTA230562 | The PTA is seeking the services of a suitably qualified and experienced consultant to undertake Detailed Visual Inspections (Level 2 Inspections) of Retaining Walls and Noise Walls on the Armadale and Thornlie Rail Lines on the Perth Urban Rail Network | Public Transport Authority | $240,279 |
| WA-PTA190931 | Digital Engineering Framework Creation, Compliance and Training | Public Transport Authority | $240,185 |
| WA-PTA190844 | MPU Requirements Management Engineers | Public Transport Authority | $238,150 |
| WA-PTA230418 | Provision of a comprehensive strategy for the future maintenance of the PTAs EMU and DMU fleets which considers optimal usage of depot and maintenance facilities, projected growth and change in the rail network, and all requirements for current and future rollingstock. | Public Transport Authority | $233,233 |
| WA-PTA190750 | The Consultant shall assist the PTA Major Projects Unit (MPU) Project Civil Engineering Manager in the planning, specification, procurement and contract management of the MPU projects. The Consultant will be allocated to one or more of the above MPU projects. The Consultant will be required to provide Civil Engineering personnel to act as Project Civil Engineer(s) (PE) within the METRONET team. The Project Engineer(s) should preferably have past PTA experience or knowledge of PTA systems and processes. The Consultant is expected to be a member of the MPU core team and will require a near to full time capacity (maximum of 40 billable hours per week) and may be required to be located in the PTA Project Office during the term of the consultancy. Others have been or will be engaged to focus on other areas of other disciplines and the Consultant will work closely with other resources within PTA to offer technical expertise in the allocated discipline. | Public Transport Authority | $229,900 |
| WA-PTA200957 | PTA require the services of a Design Consultant to work collaborativeley with the PTA team and key project stakeholders (internal and external) to lead, coordinate and deliver planning and design services for modifications to existing Perth, McIver and Claisebrook stations to accommodate 6 car trains and operate trains at 15tph. | Public Transport Authority | $229,614 |
| WA-PTA200348 | LV Critical Supplies - East Perth Standalone Equipment | Public Transport Authority | $225,525 |
| WA-PTA200253 | Low Voltage (LV) Critical Supplies - Gosnells Standalone Equipment Room (SER) | Public Transport Authority | $224,233 |
| WA-PTA190956 | Perth Space Frame Design Phase | Public Transport Authority | $217,001 |
| WA-PTA200615 | Morrison Road/Archer Street Level | Public Transport Authority | $199,727 |
| WA-PTA210732 | Retaining Wall Replacement - Crib Wall | Public Transport Authority | $199,425 |
| WA-PTA200452 | Project Engineer - 25KV Overhead Line Equipment and Traction Wiring Systems Engineering | Public Transport Authority | $192,000 |
| WA-PTA210243 | Maintenance Engineering Backlog | Public Transport Authority | $190,316 |
| WA-PTA230473 | Strengthening and Improvement Works for Rail Bridges | Public Transport Authority | $183,292 |
| WA-PTA250923 | Seeking for the service of a consultant to undertake Design & Construction methodology for major repair works and the removal of the redundant ramp to the former Leighton Station. | Public Transport Authority | $166,782 |
| WA-PTA240499 | The Public Transport Authority (PTA) is seeking the services of a suitably qualified and experienced consultant to undertake the following Scope of Services on the Sutherland Street Rail Bridge: Conduct engineering inspections, Record and monitor the bridge defects, and Engineering assessment and consultancy support. Registration of New vehicle registration: Engineering assessment of New vehicle and provide assessment report. The Sutherland Street Rail Bridge (Ellipse equipment number: F003.450/SC/RAB) is located on the Fremantle line and spans over Sutherland Street in West Perth. The existing drawing record shows the age of the bridge is approximately 112 years old. The bridge is a single-span ballasted dual narrow-gauge track rail bridge. The bridge superstructure comprises riveted main girders of varying section geometry with additional longitudinal stringers and transverse cross-bracing. The bridge superstructure is supported by masonry abutments. Since 2021, GHDAJV has been engaged previously to carryout inspections, load rating assessment with rail vehicle information and strain gauge assessment to verify the bridge performance until 2024. Based on the findings of all assessments, the bridge is needed to be monitoring and inspection regularly until the bridge replacement works planned in FY26/27 to maintenance the safety operation of rail bridge. | Public Transport Authority | $165,000 |
| WA-PTA200528 | On-board Project Engineer - High Capacity Signalling | Public Transport Authority | $165,000 |
| WA-PTA240527 | The Transwa Australind service was, up until recently, a country passenger train service travelling between Bunbury and Perth (and vice versa), connecting Perth to the South-West of Western Australia. This rail service ceased from mid-November 2023 for a period of approximately 18 months. This service was replaced with road coach, until the new Australind railcars are delivered in late 2025. The PTA seeks the provision of Services, to undertake a review of the Australind train services and develop strategies, with consideration of the following: Customer insights Travel Patterns and Analysis Resourcing and Maintenance Operational Requirements Maintenance and catering Analysis of depot stapling Maintenance and refuelling requirements; and Operating costs of the new rail cars verses the retired fleet. | Public Transport Authority | $157,479 |
| WA-PTA191000 | Environmental Consultant - TCL & YRE | Public Transport Authority | $154,770 |
| WA-PTA200524 | Wheel Slip and Slide, and Buffer Stop Interaction Risk Reduction | Public Transport Authority | $149,919 |
| WA-PTA210372 | Low Voltage Critical Supplies (LVCS) Project ? Miscellaneous Works at Cannington Standalone Equipment Room (SER) | Public Transport Authority | $147,683 |
| WA-PTA210571 | Platform Signalling Upgrade Program ? PMC project Feasibility Optioneering | Public Transport Authority | $138,512 |
| WA-PTA200527A | Load Rating of Existing Rail Bridge and Underpass Structures - Joondalup Line Assets | Public Transport Authority | $137,295 |
Agency Relationships
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.