arrow_back Contract Directory
WA-PTA260028
LIMITED SOURCING
3.1 General Scope (From Book 2) 3.1.1 The Contractor shall conduct a comprehensive site inspection of the Kelmscott Station Master’s House to verify all building-related defects identified in the 2019 Building Condition Assessment Report (Appendix 05), and identify any additional defects, compliance issues, or deterioration not previously identified in the assessment reports or within the design documentation and scope. 3.1.2 The following building rectification works shall be completed as part of the Contractor’s SOWs: 3.1.2.1 Removal or making safe of all redundant electrical fittings and wiring in accordance with AS/NZS 3000. 3.1.2.2 Retention of all existing windows and external doors; clean and repaint joinery to match the original colour scheme. 3.1.2.3 Replacement of all internal doors; a detailed door schedule will be provided as part of the construction documentation. 3.1.2.4 Repair of wall cracks and replastering of any damaged wall sections. 3.1.2.5 Cleaning of all walls and repainting with appropriate finishes. 3.1.2.6 Replacement of damaged timber floorboards with new boards matching the original design. 3.1.2.7 Sanding and oiling of all timber flooring. 3.1.2.8 Repair and repainting of any cracks or damage in the ceilings. 3.1.2.9 Cleaning and clearing of chimney flues and fireplaces of debris. 3.1.2.10 Cleaning and repainting of skirting boards as required. 3.1.2.11 The Contractor shall provide safe access for the Structural Consultant to inspect the roof. Based on the Structural Consultant’s advice, the Contractor shall incorporate any additional reinstatement, or rectification works for the roof into the Scope of Works, subject to the Principal’s approval. 3.2 Disciplines Scope 3.2.1 The Contractor shall carry out all the required scope and works for relevant disciplines including Architect, LV Electrical, Mechanical, Structure and Hydraulic described in Appendix 01 – Detailed Design Drawings (IFC) and Specification. Please refer to Book 2 for more details
Current Value
$1,344,754
Start
17 Apr 2026
End
16 Apr 2028
Category
—
timeline Amendment Trail
0 EVENT(S)NO AMENDMENTS RECORDED
Paid RAG platform
Want AI to flag contracts like this coming up for renewal?
The paid RAG platform monitors expiry dates across your target categories, alerts your BD team 90 days out, and pulls the incumbent's past performance into a briefing doc automatically.