arrow_back Supplier Directory
FD
Foster's Services Data - Electrical (Foster's Services Pty Ltd)
ABN unknown
Total Won
$10.8M
Contracts
36
Agencies
7
show_chart Government Revenue Over Time
Contract History
| WA-22096628004 | East Metropolitan Health Service (EMHS) requires a contractor to undertake the disconnection and removal of the redundant Main Switchboard (MSB) and associated cabling, trays etc and provide the installation, commissioning and certification of the new MSB and Generator upgrade, including the extension and/or replacement of associated equipment and cables at Armadale Health Services (AHS). | East Metropolitan Health Service | $2,089,904 |
| WA-22096628002 | Emergency Repairs to Main Switchboard at Armadale Health Service (AHS) | East Metropolitan Health Service | $1,294,237 |
| WA-HSS202615814 | Health Support Services (HSS) is seeking a suitably qualified contractor to deliver fibre optic and associated infrastructure works at Mt Lawley Hospital as part of the hospital’s transition from St John of God Health Care to East Metropolitan Health Service (EMHS). The works include installation and testing of new fibre cabling between communications rooms, supply and installation of UPS units, rack PDUs and cable trays, verification and remediation of rack earthing, and post?implementation cable management. These upgrades form part of a whole?of?hospital infrastructure program being delivered by HSS on behalf of EMHS to support reliable ICT connectivity and CHIIP?required standards. | Health Support Services | $753,126 |
| WA-SMHS202311482 | Replacement of 2 x non-essential transformers, switchboard, fans and supply cabling; removal of existing transformers, switchboard, fans and supply cabling; associated works. | South Metropolitan Health Service | $627,695 |
| WA-NMHS20194113 | The North Metropolitan Health Service requires the upgrade, commissioning and maintenance of up to seventy-eight (78) electrical and mechanical switchboards with new circuit breakers at the King Edward Memorial Hospital (KEMH). Elements of the current electrical infrastructure at KEMH have reached the end of useful life and require upgrading to maintain safe and reliable electricity supply across the site. Due to the aging electrical infrastructure, there is a risk that the Hospital will experience loss of power supply, potentially compromising patient care. | North Metropolitan Health Service | $553,629 |
| WA-22096628001 | East Metropolitan Health Services is seeking a contractor to provide the services for the following Separable Portions. Depending on the responses the Principal will reserve the rights to choose which of the Separable Portions they will continue with. Separable Portion 1 - Replacement of 6 x Air Circuit Breakers; Separable Portion 2 - Provision of new Diesel Generator Transfer switch system; and Separable Portion 3 - Provision of New Schneider KPX External kiosk for replacement of existing Sub-Station No.1 & LV Main Switchboard | East Metropolitan Health Service | $500,000 |
| WA-23043933003 | EMHS requires the services of an electrical contractor to carry out enabling works for the Digital Medical Records (DMR) project at RPH. The work includes, but is not restricted to the installation of electrical and cabinetry requirement. | East Metropolitan Health Service | $477,035 |
| WA-HSS202514605 | The Facilities Works project is responsible for delivering critical facilities works to enable the implementation of CHIIP in communications control rooms (CCR) and network enclosures throughout WA Health. These works are for the installation of CHIIP required Infrastructure at Fremantle Hospital SMHS (whole of hospital). The extent of the works to be completed is outlined in Attachment 1 (Summary of Works, which details the required tasks that form this project. The scope of facilities remediation work includes the deployment of equipment racks and uninterruptible power supplies (UPS), increased fibre cabling and replacement where required, and installation of improved cooling and ventilation. | Health Support Services | $416,830 |
| WA-MW24036ELEC | The contractor is required to carry out the works as detailed in this document and the accompanying documents and drawings which together form a single comprehensive document. | North Metropolitan Health Service | $391,034 |
| WA-PWST202210262A | PathWest Laboratory Medicine WA (PathWest) QEII requires the supply and installation of High Voltage (HV) Cabling to connect from an existing spare HV switch in J Block Substation to a new dry core transformer to be installed in PP Block transformer and HV switch room. The secondary side of the transformer will be connected to a new Primary Essential Main Distribution Board (PEMDB) and thence to the existing UPS and ESS main distribution board. Regulatory requirements will also mean that the existing cabling to the fire pumps will be terminated at the new PEMDB. | PathWest Laboratory Medicine WA | $307,267 |
| WA-NMHS20226002a1 | Failed High Voltage Power cable emergency works at OPH (1) Emergency work performed by Foster's Service. | North Metropolitan Health Service | $275,000 |
| WA-WACHSMW202210139 | Provision of annual Inspection and Reporting of body and cardiac protected electrical areas in WA Country Health Service Midwest | WA Country Health Service | $244,737 |
| WA-HSS202413343 | The Electronic Medical Record (EMR) Stage 1 Program requires the provision of WiFi network hardware at three (3) NMHS sites in readiness for the Digital Medical Record Rollout. The NMHS DMR Rollout sites and dates are: 1. Osborne Park Hospital and Osborne Lodge - by TBC 2. Graylands Hospital – by TBC 3. Selby/Lemnos Street – by TBC As part of the DMR implementation, wireless local area network (WLAN) infrastructure is required for areas of the hospital(s) where DMR will be used. | Health Support Services | $240,000 |
| WA-23043933 | The East Metropolitan Health Service (EMHS) requires the provision of Electrical and Minor Works for AKG Digital Medical Records ? Electrical and Building at Armadale Health Service (AHS) and Kalamunda Health Services (KHS). To provide power and wiring infrastructure to facilitate the new Digital Medical Records | East Metropolitan Health Service | $237,332 |
| WA-QEII20210295 | To supply and install fiber to the following location indicated in the Request Document. This is to meet QEII campus Access-Distribution network upgrade for critical business units. | North Metropolitan Health Service | $218,385 |
| WA-EMHS202311352 | Relocation and commissioning of existing generator at BHS site to A Block thereby expanding existing power network. | East Metropolitan Health Service | $211,231 |
| WA-MW25008 | Installation of Electrical Data and Monitor Arms. | North Metropolitan Health Service | $174,126 |
| WA-EMHS23066537 | A broad electrical services scope includes the replacement of the two BHS North substation Electrical Main Breaker Switches with equivalent protective devices within the same switchboard. The switchboard is serviced by two parallel 500kVA customer owned transformers fed from the HV switchroom located at the eastern end of the Bentley Health Service site | East Metropolitan Health Service | $171,089 |
| WA-WACHS202515089 | WACHS required a suitably qualified and licensed contractor to undertake electrical, cabling, and computer/communication room consolidation works at WACHS Northam Health Service. | WA Country Health Service | $155,173 |
| WA-22009437005 | Electrical Works for Temporary ED & Respiratory Pathways Facility at AHS | East Metropolitan Health Service | $133,242 |
| WA-21008299000 | SUPPLY AND INSTALL NEW PATIENT MONITORING (HIVE) INFRASTRUCTURE INTO AHS (ARMADALE HEALTH SERVICES) | East Metropolitan Health Service | $128,382 |
| WA-HSS202616002 | Health Support Services (HSS), in partnership with East Metropolitan Health Service (EMHS), is seeking quotations for the Wi - Fi Infrastructure Uplift at Mount Lawley Hospital ( MLH ). The works involve the supply and installation of CHIIP compliant cabling, Wireless Access Point ( WAP ) mounting, and associated infrastructure to deliver secure and resilient Wi - Fi coverage across the MLH campus . All works are to be undertaken in accordance with Panel Arrangement HSS304918 and the requirements outlined in the RFQ . Responses must include: A completed RFQ Form A written proposal addressing the requirements Pricing Proposed Project Schedule Organisational Capability and Capacity Demonstrated Experience Any assumptions, exclusions, or dependencies Please refer to the RFQ documentation for the full scope of works and all requirements. | Health Support Services | $126,541 |
| WA-QEII20230378 | ELECTRICAL SERVICES AND COMPLIANCE TESTING FOR DD, HH, RR AND UU BLOCKS at QEII Medical Centre. | North Metropolitan Health Service | $124,318 |
| WA-SMHS202312140 | Installation of 4x EV Charging Stations and required cabling. | South Metropolitan Health Service | $94,052 |
| WA-WACHS202413057 | The WA Country Health Service (WACHS) requires the provision of services to undertake annual testing, tagging and certification of body and cardiac protected areas, and line isolation and overload monitors (LIOMs), in compliance with relevant Australian Standards. The services will be delivered at various WACHS sites throughout the South-West Region. | WA Country Health Service | $92,564 |
| WA-20034819 | East Metropolitan Health Service (EMHS) currently stores and manages controlled substances using manual safes or cupboards and paper-based record keeping systems. EMHS is seeking to replace the current system with an Electronic Medication Management (EMM) solution. This scope is specific for the Electrical component and includes the installation of power data for the EMM equipment. | East Metropolitan Health Service | $91,733 |
| WA-PWST20183090 | Routine testing of Emergency lighting PP block QEII medical centre | PathWest Laboratory Medicine WA | $89,585 |
| WA-16059702 | Relocation of WACHS to Ward 6A Royal Perth Hospital | East Metropolitan Health Service | $87,739 |
| WA-NMHS20217136 | EDR Project - Power and Data for Warwick General Dental Clinic | North Metropolitan Health Service | $81,335 |
| WA-NMHS202310190 | KEMH Upgrade and Maintenance Works -Supply & Installation of Additional Emergency and Exit Lighting in A & B Blocks | North Metropolitan Health Service | $77,399 |
| WA-SMHS202311294 | An earth electrode replacement program has been undertaken at Fremantle Hospital to bring it into compliance with the Australian Standard Energy Networks Association (ENA) EG1-2006 Substation Earthing Guide. This phase of the program is for the testing of the new earthing system. | South Metropolitan Health Service | $77,333 |
| WA-22009437001 | Electrical Works for Temporary ED & Respiratory Pathways Facility at RPH | East Metropolitan Health Service | $63,683 |
| WA-FINW0184821 | Inspection and Reporting of Cardio/Body Protected Areas - Various WA Country Health Services (WACHS) Sites | (inactive) Department of Finance | $56,345 |
| WA-WACHS202312222 | Provision of 24/7 state-wide security response via a 24/7 operational CCTV control room. | WA Country Health Service | $53,078 |
| WA-20023951008 | Electrical Works | East Metropolitan Health Service | $24,000 |
| WA-QEII20200230 | Body Protected Area testing is required at QEII Medical Centre in Blocks C, D, E & G. The testing is to meet Australian Standard AS/NZ 3003:2018 | North Metropolitan Health Service | $23,048 |
Agency Relationships
East Metropolitan Health Service
$5.5M
13 contracts
North Metropolitan Health Service
$1.9M
9 contracts
Health Support Services
$1.5M
4 contracts
South Metropolitan Health Service
$799.1K
3 contracts
WA Country Health Service
$545.6K
4 contracts
PathWest Laboratory Medicine WA
$396.9K
2 contracts
(inactive) Department of Finance
$56.3K
1 contracts
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.