arrow_back Supplier Directory
BC
BOS Civil (BOS Civil Pty Ltd)
ABN unknown
Total Won
$6.2M
Contracts
7
Agencies
5
show_chart Government Revenue Over Time
Contract History
| WA-FINW0842723A | Department of Education - Wungong Primary School - Standard Pattern Primary School - Forward works. | (inactive) Department of Finance | $3,072,847 |
| WA-PTA06 | Programmed Facility Management Pty Ltd (PFM) on behalf of Public Transport Authority (PTA) for Transperth are seeking Tenders from suitably qualified and experienced contractors to undertake Branch Drain Encapsulation Works at Anvil Way, Welshpool. The works are limited to providing a detailed design and execution of the works to encapsulate the Water Corporation Western Australia (WCWA) branch drain that runs through lots 51, 92 and 562 on Anvil Way, Welshpool and interconnects existing WCWA compensating basins in the locality. | Programmed Facility Management | $1,143,061 |
| WA-DBCARIAT7624 | Rottnest Island Authority (RIA) is seeking suitably qualified and experienced Contractor for the South Thomson - Hotel Boardwalk. The objective of these works is to provide enhanced visitor experiences with improvements to visitor amenity on the island. | Rottnest Island Authority | $846,558 |
| WA-DBCARIAT6524 | Tenders are invited by Rottnest Island Authority (RIA) for the execution of the Works Under Contract (WUC) described in the detailed Scope of Works, DBCARIA T6524 Geordie Bay Water Supply Main Scope of Works, IFT drawings, Technical Specification, and any other documents included in DBCARIA T6524 Geordie Bay Water Supply Main Schedule of Tender Documents. The WUC includes all operations, labour, plant, materials, supervision, survey, and all necessary works to complete the whole of the WUC, or any additional work or variations as directed by the Superintendent. The cost includes all costs associated with delivery and transport of materials, plant and personnel and anything else required to complete the works to Rottnest Island. | Rottnest Island Authority | $768,920 |
| WA-P26027C | WA Rugby Centre Carpark Upgrade | VenuesWest | $127,092 |
| WA-MRA10807 | Granite Rectification Works at Elizabeth Quay and Barrack Square | (inactive) Metropolitan Redevelopment Authority | $109,678 |
| WA-RFQWA1699107 | Programmed Facility Management Pty Ltd (PFM) on behalf of Public Transport Authority (PTA) are seeking quotes from suitably qualified and experienced contractors to undertake the design and construction of modifications required to A platform to incorporate an additional bus stand at Elizabeth Quay Bus Station. Expectation The works are expected to be completed by Sunday 16 December 2018. Lodgment Lodgement of Quotes will only be accepted via the TendersWA web portal: https://www.tenders.wa.gov.au/ | Programmed Facility Management | $104,058 |
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.