arrow_back Supplier Directory
J
Jomar (WA)
ABN unknown
Total Won
$23.9M
Contracts
20
Agencies
1
show_chart Government Revenue Over Time
Contract History
| WA-MRWA0156240003 | Substructure and Superstructure Repairs including pile repair, corbel replacement, stinger installation, waler & bracing replacement, wing wall repair, handrail repair, approach road surface removal and repair. Pre-qualification Required - BT | Main Roads Western Australia | $5,503,410 |
| WA-MRWA0098160243 | Pre-Qualification: B1 Bridge 1581 Concrete crack repairs, anti-carbonization coating application, drainage repairs, general cleaning within the bridge void of all debris, painting over of Graffiti within void, and Vandalism repairs to stone pitching at abutments. Bridge 1060 drainage modification, general cleaning within the bridge void of Debris and Graffiti and Vandalism repairs of stone pitching at abutments. | Main Roads Western Australia | $2,915,000 |
| WA-MRWA0098160186 | Structure No. 4512 Scott St SLK 0.25 over Helena River ? Stage 1 ? Substructure and Superstructure Repairs | Main Roads Western Australia | $2,644,634 |
| WA-MRWA0098160220 | Structure No 1060 Mount Henry Bridge on Kwinana Freeway over the Canning River - Concrete Maintenance repairs and protective coating application. | Main Roads Western Australia | $1,870,000 |
| WA-MRWA0098160088 | Bridge 0954 Replacement of Traffic Safety Barriers, (Perth Metropolitan Area) Traffic safety barriers installation, including end treatment, | Main Roads Western Australia | $1,446,536 |
| WA-MRWA0156240002 | Repairs to bridges 0332, 0383 and 0729 including Pier, wingwall, corbel and abutment repairs and replacement of pier halfcaps, corbel, joint seal and bracing. | Main Roads Western Australia | $1,444,190 |
| WA-MRWA0156240007 | Stringer packing and bolting, abutment pile banding and timber sheeting repair, corbel packing, replacement and repair, pier half cap replacement, pier pile packing, banding and bolt replacement, gap filling at abutment sill beams. | Main Roads Western Australia | $1,009,800 |
| WA-MRWA0098160182 | Structures 9003A, 9004B & 9005B Maintenance Repairs. Balustrade Painting, Deck Crack Repair and Patch Repair, Sealant | Main Roads Western Australia | $897,240 |
| WA-MRWA0098160148 | Structure No 0931 ? Leach Hwy over Canning River - Superstructure Repairs | Main Roads Western Australia | $841,960 |
| WA-MRWA0098160140 | Structure 1485 Spencer Rd over Roe Hwy - Installation of Protection Screens - Metropolitan Region | Main Roads Western Australia | $752,910 |
| WA-MRWA0098160250 | Remove Guardrail and Install Traffic Barrier - Bridge No 1188 Bushmead Road over Roe Highway | Main Roads Western Australia | $732,600 |
| WA-MRWA0098160106 | Structure No 4164 - Top Beverley York Rd over Mackie River ? Substructure Repairs | Main Roads Western Australia | $702,130 |
| WA-MRWA0098160231 | Structure Repair and Maintenance Works for Bridges No. 0004A, 0119, 1039, Footbridges No. 9190 & 9215 and Underpasses No. 9013, 9131 & 941 | Main Roads Western Australia | $607,185 |
| WA-MRWA0098160109 | Structure 1100 Leach Highway over Albany Highway superstructure repair and barrier upgrade. | Main Roads Western Australia | $595,332 |
| WA-MRWA0098160118 | Jarrahdale Rd over Medulla Brook replace timber bridge with culvert | Main Roads Western Australia | $573,631 |
| WA-MRWA0098160123 | Structure No. 0002 and Structure No. 0003 ? Substructure and Superstructure Repairs | Main Roads Western Australia | $327,469 |
| WA-MRWA0098160232 | Structure Repair & Maintenance Works - Underpasses No. 9017, 9155, 9193, 9209, 9322, 9393 & Gantry 8066 | Main Roads Western Australia | $310,758 |
| WA-MRWA0098160091 | Maintenance of Protective Coating - Sign Gantry No 8003 on Kwinana Freeway (South bound) ? south of Mt Henry Bridge (SLK 8.86) and Sign Gantry No 8019 on Graham Farmer Freeway (Westbound) east of Windan Bridge (SLK 4.01) | Main Roads Western Australia | $286,680 |
| WA-MRWA0098160262 | Repair on Bridge 1360, Reid Highway over the Swan River in the City of Midland - Expansion joint seal removal & installation of new drainage channels. | Main Roads Western Australia | $235,796 |
| WA-MRWA0098160192 | Bridge Maintenance works to Structures 0670, 1009, 1020 and 9104 | Main Roads Western Australia | $206,480 |
Agency Relationships
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.