arrow_back Supplier Directory
AP
Ace Plus (Finestones Investments Pty Ltd)
ABN unknown
Total Won
$14.0M
Contracts
6
Agencies
3
show_chart Government Revenue Over Time
Contract History
| WA-CAHS202518093 | For the provision of ongoing Plumbing and Hydraulic Maintenance Services for PCH as and when required. Includes for preventative maintenance and reactive maintenance. This Request was issued to all panel members in the Category N – Plumbing Category of HSS304918 Whole of Health Trades Panel Contract located in the Perth Metropolitan Region. The Contract will not be split into separable portions or awarded to multiple suppliers. | Child and Adolescent Health Service | $7,197,192 |
| WA-F2400384 | VenuesWest requires a panel of licensed Contractors to provide plumbing services at eleven (11) nominated VenuesWest venues. These services include plumbing maintenance, emergency repairs, minor modifications and installations of plumbing services, and temporary works associated with events and festivals. | VenuesWest | $4,095,000 |
| WA-SMHS202514566 | The project consists of the design, fabrication and installation of a new CSSD primary Reverse Osmosis plant and associated non-potable cleaning process water as well as Point of Use department specific Reverse Osmosis generation at Fremantle Hospital to ensure Reverse Osmosis and cleaning process water quality to CSSD and associated departments is supplied in line with AS5369 requirements. The existing hospital CSSD and associated departments are to remain in service while the plants are constructed, with existing services to remain functional, until such time it can be made redundant, decommissioned and demolished. | South Metropolitan Health Service | $1,763,190 |
| WA-SMHS202515429 | Restricted to members of the HSS304918 Panel arrangement only The intent of this project is to provide the required modification to the existing warm water system within W Block at Fremantle hospital to allow temperature increase to a hot water system temperatures. This will include the installation of temperature control devices including access panels where documented. Removal of localised temperature boosting hot water units, removal of non-compliant dead legs, installation of automated flushing systems and installation and changeover of a new hot water generation plant and removal of the existing plant. | South Metropolitan Health Service | $797,940 |
| WA-SMHS202311364 | To address water quality issues in line with AS/NZS 4189, an Ultra Filtration System with UFW filter module is being installed to provide an independent pre-filter that is used as a solution against bacteria like Legionella, E-coli, Pseudomonas etc. | South Metropolitan Health Service | $107,800 |
| WA-SMHS202514838 | Fremantle Hospital V Block Partial Sewer Replacement (West) | South Metropolitan Health Service | $52,635 |
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.