arrow_back Supplier Directory
TP
Total Project Solutions (Total Project Solutions Pty Ltd)
ABN unknown
Total Won
$22.5M
Contracts
27
Agencies
6
show_chart Government Revenue Over Time
Contract History
| WA-CAHS202514858 | The Child and Adolescent Health Service (CAHS) is inviting Offers from suitably qualified and experienced Respondents for the demolition and replacement of the existing Level 1 rooftop garden at Perth Children’s Hospital (PCH). The garden is located between the Burns and Oncology wards. The primary objective of the Telethon Burns and Oncology Rooftop Garden Project (Project) is to deliver a?safe, interactive, engaging play-based and therapeutic garden?that enhances the well-being of children in a hospital setting. The space has been designed to: Support play and interaction?– The garden provides a variety of play opportunities suitable for children of different ages and abilities. Maintain a therapeutic and calming environment?– The landscaping and design contributes to a sense of relaxation and recovery. Ensure safety and accessibility?– The space complies with all regulatory safety standards, accessibility requirements, and durability needs for a healthcare setting. Retain key functional elements?–The space includes designated play zones, seating for families, shaded areas, and greenery. The Project is located on Level 1 between Wards 1A (Oncology) and 1B (Burns) at PCH. The existing Level 1 rooftop garden was built during the construction of PCH in 2016/2017 as an outdoor play space for the immunocompromised and vulnerable children on these wards. The existing garden includes shade structures, concrete seating nooks and a small number of plants and trees. CAHS has the opportunity to enhance this garden area to better support patient use, including wheelchair access and play-based activities. Improvements will address the current undulating surface, the condition of the space, the design of the perforated shade canopies, and the use of small stones as flooring, to create a safer and more functional outdoor environment. This will provide outdoor play access for children with varying degrees of ability during their oncology, haematology and burns treatments. As it currently stands, PCH does not have a suitable and safe outdoor space that Burns, and Oncology patients can utilise. Extensive consultation with key stakeholders has occurred resulting in an informed design that meets the project’s intent of a 750sqm interactive play-based and therapeutic outdoor space. | Child and Adolescent Health Service | $4,689,246 |
| WA-MW24058CON1B | NMHS requires the services of a licenced contractor to undertake the Patient Bathroom Upgrades and Soil Stack Replacements in G Block at Sir Charles Gairdner Hospital (SCGH), Nedlands, Western Australia. The proposed scope of works includes the upgrade of patient bathrooms and soil stack replacements, inclusive of hydraulic and electrical services. | North Metropolitan Health Service | $2,124,368 |
| WA-CAHS202312519 | The Child and Adolescent Health Service (CAHS) requires a Contractor for the construction of Separable Portion 1 and 2 for the fit out for the Perth Children?s Hospital (PCH) shell theatre. The PCH Theatre complex consists of eleven (11) Operating rooms inclusive of an iMRI. There is one shelled space for a future theatre fit out (the 12th Theatre) located between theatre nine (9) and the iMRI suite. The establishment of the 12th operating theatre as a general theatre will provide a total of twelve (12) theatres, thereby increasing CAHS operating theatre capacity and providing an opportunity to future proof for digital enhancements in the emerging fields of artificial intelligence and robotic surgery. By increasing the number of theatres to 12, a minimum of 18 Post Anaesthetic Care Unit (PACU) beds is required to meet the Western Australia Health Facility Guideline (WAHFG). Currently, PCH only have 17 PACU beds. To meet this requirement, several forward works are required to take place prior to the fitout work in Theatre 12. The project is proposed to be delivered in two portions: Separable Portion 1 work involves: Conversion of the PACU isolation room into an additional patient bay Conversion of PACU isolation room ensuite into medical gas store and cleaner storage Reconfiguration of theatre reception office into a storage room and reconfiguration of the reception area to add an additional workstation Minor works to storage rooms to remove overhead cabinets and relocate to other work areas. Separable Portion 2 work involves: Fitting out of the 12th operating theatre, currently a shell An anaesthetic induction room An exit / scrub bay Premises will be occupied during the currency of the Contract. The Contractor shall ensure that it causes minimal inconvenience and disturbance to the occupants. | Child and Adolescent Health Service | $1,999,360 |
| WA-22054613002 | East Metropolitan Health Service (EMHS) requires upgrades and installation works at Armadale Health Service (AHS). The works include the replacement and upgrade of anti-ligature fixtures and fittings within existing Mental Health (MH) Wards at this site | East Metropolitan Health Service | $1,615,152 |
| WA-EMHS202514715 | The East Metropolitan Health Service (EMHS) requires the replacement and upgrade of anti-ligature fixtures and fittings within the Karri Mental Health (MH) Ward at AHS including but not limited to Mechanical, Electrical, Hydraulic, Structural, and building fabric elements. | East Metropolitan Health Service | $1,340,613 |
| WA-NMHS202311386CON | North Metropolitan Health Service (NMHS) is seeking offers for Mechanical, Electrical, and Hydraulic services essential for upgrading and ensuring compliance within the Hospital Sterile Services Department (HSSD) at King Edward Memorial Hospital (KEMH) located at Lower Ground Level of B-Block. | North Metropolitan Health Service | $1,133,790 |
| WA-NMHS202210759 | The North Metropolitan Health Service - Development is seeking responses from registered builders with the requisite roofing experience to undertake roof replacement and associated works to the specified areas outlined in the Scope of works & Specification and drawing. | North Metropolitan Health Service | $1,088,077 |
| WA-PWST202311056 | A Mandatory site visit will be part of the Request. Mandatory site briefing for all Respondents will be conducted at: Date: Thursday, 16th March 2023. Time: 10:00AM Australian Western Standard Time (AWST). Location: J Block PathWest Reception, QEII Hospital NEDLANDS. The Respondent is requested to confirm its attendance by no later than 2:30PM on the 15th March 2023 (AWST) by contacting Davyd Batt on Telephone Number: 0418 925 413 or Davyd.Batt@health.wa.gov.au. Failure to attend the Request Mandatory Briefing will result in the Offer being ineligible for further consideration. | PathWest Laboratory Medicine WA | $1,000,693 |
| WA-EMHS202414065 | The EMHS requires the replacement and upgrade of anti-ligature fixtures and fittings within the Yorgum Mental Health (MH) Ward at AHS including but not limited to Mechanical, Electrical, Hydraulic, Structural, and building fabric elements. | East Metropolitan Health Service | $906,806 |
| WA-EMHS202514723 | The East Metropolitan Health Service (EMHS) requires the replacement and upgrade of anti-ligature fixtures and fittings within the wards and bathrooms in the Mental Health (MH) Wards 8F, 10A and 10B at Bentley Health Services (BHS) including but not limited to mechanical, electrical, hydraulic, and building fabric elements. | East Metropolitan Health Service | $848,653 |
| WA-QEIIMCT202101 | Under Trade Panel HSS304918 (Minor Works), the Queen Elizabeth II Medical Centre Trust requires a contractor for the refurbishment of two adjacent single storey (approx. 615m2) buildings (known as TT Block) at the QEII Medical Centre in Nedlands, from its current use as a day therapy centre to office space. | Queen Elizabeth II Medical Centre Trust | $659,712 |
| WA-CAHS202412970 | This is an agreement for the provision of construction services for the Perth Chldren's Hospital - Ward 5a Refurbishment - Balcony Enclosure Works. | Child and Adolescent Health Service | $593,898 |
| WA-NMHS20229352 | The North Metropolitan Health Service - Development is seeking responses from registered builders with the requisite experience to undertake the required works to the specified areas outlined in the Scope of works & Specification and drawing. | North Metropolitan Health Service | $579,745 |
| WA-23015877 | Expansion of AHS ED Waiting area | East Metropolitan Health Service | $577,500 |
| WA-NMHS202311344 | NMHS requires creation new Stress Room and Therapy Room to G Block Level 1. The North Metropolitan Health Service - Development is seeking responses from registered builders with the requisite experience to undertake the required works to the specified areas outlined in the Scope of works & Specification and drawing. | North Metropolitan Health Service | $552,298 |
| WA-MW24011CON | NMHS is seeking offers for the provision of a Builder to undertake the refurbishment of the OPH B Block Xray Room Refurbishment NB: In addition to the attached specifications, a specialist contractor will be required to facilitate the removal and disposal of existing x-ray unit. | North Metropolitan Health Service | $367,008 |
| WA-NMHS202311596CON | North Metropolitan Health Service (NMHS) is seeking offers for the provision of a builder to undertake the required works detailed in the Specifications below. | North Metropolitan Health Service | $329,275 |
| WA-NMHS202414237 | North Metropolitan Health Service (NMHS) has identified nine (9) rooms on the lower ground floor of G Block to convert to sixteen (16) bed bays as apart of these forward works. In addition to these bed bays, four (4) existing wet areas will be refurbished to patient ensuites to provide suitable associated amenities. Refer to the below for detailed scope of works: Appendix A – Tender Documentation - Architectural Appendix B – Tender Documentation - Services | North Metropolitan Health Service | $323,310 |
| WA-22096628005 | East Metropolitan Health Service (EMHS) requires a contractor to undertake building works at the Armadale Health Services (AHS) for the construction of a suitable switch room for a new electrical Main Switch Board. | East Metropolitan Health Service | $318,276 |
| WA-23082131003 | East Metropolitan Health Service (EMHS) requires a contractor to undertake refurbishment of H Block Staff Amenities | East Metropolitan Health Service | $315,596 |
| WA-NMHS202311228 | North Metropolitan Health Service (NMHS) is seeking offers for the provision of a Builder to undertake the Walkway Weather Protection at Osborne Park Hospital. | North Metropolitan Health Service | $285,714 |
| WA-NMHS202311455CON | NMHS is seeking offers for a Contractor to undertake the required works detailed in the Specifications below. | North Metropolitan Health Service | $275,019 |
| WA-NMHS202311070CONS | North Metropolitan Health Service (NMHS) is seeking offers for the provision of a Builder to undertake the refurbishment works located at Osborne Park Hospital F Block Ward 7 Kitchen. | North Metropolitan Health Service | $181,712 |
| WA-24093497002A | East Metropolitan Health Service (EMHS) requires a contractor to undertake construction works for a footpath at the Armadale Health Service (AHS) near Goline House | East Metropolitan Health Service | $175,840 |
| WA-PWST202311014 | The Customer, PathWest LMWA, is seeking offers for the conversion of a reception area in J Block, QEII into offices and a new reception area. Details and drawings are provided in attached Tender Documents. | PathWest Laboratory Medicine WA | $110,366 |
| WA-MWSP52FIRE22 | Development of DFES hardstand for compliance purposes at C Block Sir Charles Gairdner Hospital | North Metropolitan Health Service | $76,982 |
| WA-SMHS202210189 | A prototype room was constructed to demonstrate and test the types of bedrooms and ensuites that will be included in the new 40-bed mental health unit, which is to be constructed in Fremantle Hospital's V-block. | South Metropolitan Health Service | $75,338 |
Agency Relationships
North Metropolitan Health Service
$7.3M
12 contracts
Child and Adolescent Health Service
$7.3M
3 contracts
East Metropolitan Health Service
$6.1M
8 contracts
PathWest Laboratory Medicine WA
$1.1M
2 contracts
Queen Elizabeth II Medical Centre Trust
$659.7K
1 contracts
South Metropolitan Health Service
$75.3K
1 contracts
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.