arrow_back Supplier Directory
DC
DM Civil (D.M Drainage & Constructions Pty Ltd)
ABN unknown
Total Won
$15.2M
Contracts
10
Agencies
2
show_chart Government Revenue Over Time
Contract History
| WA-DBCARIAT2825 | Rottnest Island Authority (RIA) is inviting Tenderers for the execution of Works Under Contract (WUC) described in the detailed Scope of Works, DBCARIAT2825 Staff Housing Sewer Headworks 2025 Scope of Works, Tender drawings, Technical Specification, and any other documents included in DBCARIAT2825 Staff Housing Sewer Headworks Schedule of Tender Documents. | Rottnest Island Authority | $3,975,361 |
| WA-DOC202196010 | The Department of Communities requires the Construction of New Wastewater Ponds for the Jigalong Aboriginal Community. | Department of Communities | $3,530,905 |
| WA-DOC202196011 | Upgrade of Wastewater Pump Station(WWPS) and Electrical Switchboard and Construction of Pressure Main for Jigalong Aboriginal Community. | Department of Communities | $2,423,990 |
| WA-DBCARIAT6424 | Tenders are invited by Rottnest Island Authority (RIA) for the execution of the Works Under Contract (WUC) described in the detailed Scope of Works, DBCARIAT6424 Geordie Bay Units Water Main 2024 Scope of Works, Tender drawings, Technical Specification, and any other documents included in DBCARIAT6424 Geordie Bay Units Water Main 2024 Schedule of Tender Documents. The WUC includes all operations, labour, plant, materials, supervision, survey, and all necessary works to complete the whole of the WUC, or any additional work or variations as directed by the Superintendent. The cost includes all costs associated with delivery and transport of materials, plant and personnel and anything else required to complete the works to Rottnest Island. | Rottnest Island Authority | $1,840,765 |
| WA-DBCARIAT2722 | Tenders are invited by the Rottnest Island Authority, for the North Thomson Sewerage Pump Station SPS 06 ? Upgrade Works and Emergency Storage. | Rottnest Island Authority | $1,543,647 |
| WA-DBCARIAT2724 | Tenders are invited by the Rottnest Island Authority (RIA) for the execution of the Works Under Contract (WUC) for the Quod Sewer Extension 2024 project. The WUC is described in the detailed Scope of Works, DBCARIA T2724 Quod Sewer Extension 2024 Scope of Works, RFT drawings, Technical Specification, and any other documents included in DBCARIA T2724 Quod Sewer Extension 2024 Schedule of Tender Documents. | Rottnest Island Authority | $615,848 |
| WA-DBCARIAT0121 | The current 90mm PE brine discharge pipeline is inadequate for the current flows and causes back pressure in the desalination plant resulting in reduced production. To meet future potable water demand, desalination production is to be increased with another train in October 2020 which will require construction of a new DN180 HDPE PN16 Brine Discharge pipeline for additional reject brine flows and support the existing 90mm Brine discharge pipe | Rottnest Island Authority | $569,637 |
| WA-DBCARIAT3221 | The scope of works include replacement of the existing water distribution infrastructure includes new HDPE pipes and fittings, new isolation valves, new meters, and valve pits. | Rottnest Island Authority | $328,140 |
| WA-DBCARIAT0521 | The current 90mm PE brine discharge pipeline is inadequate for the current flows and causes backpressure in the desalination plant resulting in reduced production. To meet future potable water demand, desalination production is to be increased with another train in which will require construction of a new DN180 HDPE PN16 Brine Discharge pipeline for additional reject brine flows and support the existing 90mm Brine discharge pipe. | Rottnest Island Authority | $315,941 |
| WA-DBCARIAQ1120 | Desalination Plant Earth Works | Rottnest Island Authority | $103,981 |
Agency Relationships
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.