arrow_back Supplier Directory
JC
Jonor Construction Pty. Ltd. 20 Clifford St Davenport WA Australia 6230
ABN unknown
Total Won
$44.7M
Contracts
24
Agencies
2
show_chart Government Revenue Over Time
Contract History
| WA-MRWA0098160203 | Option 1: Replacement of both bridges 3275 and 3923, including required earthworks Option 2: Replacement of bridge 3275, including required earthworks | Main Roads Western Australia | $7,529,223 |
| WA-MRWA0098160131 | Structure No. 0235 Bussell Hwy and Structure No. 0238 Tuart Dr ? Bridge Replacements | Main Roads Western Australia | $6,665,437 |
| WA-MRWA0098160222 | Bridge Replacement with Culvert Package - the bridges 0199A over Crooked Brook - Structure 0466B over Preston River South - Structure 4823A over Station Gully - South West Region | Main Roads Western Australia | $3,868,053 |
| WA-MRWA0098160256 | Replace Bridges 0255 and 0520A with Bridges 0255A and 0520B (RCBC) | Main Roads Western Australia | $3,602,384 |
| WA-MRWA0098160112 | Structure 3537 (North Yunderup Road over Wilgie Creek) Replace with New Bridge ? Demolition of the existing bridge. ? Construction of Bridge 3537A | Main Roads Western Australia | $3,332,104 |
| WA-DBCA413WT1782024 | The Department of Biodiversity, Conservation and Attractions is seeking the services of a suitably qualified and experienced contractor to remove the existing timber trestle bridge (#4757), prepare the site and then construct a new 36mtr concrete bridge over the Weld River, North Walpole. The project will be staged over two years, as outlined below: Stage 1 - Removal of existing bridge and site preparation (anticipated timeframe 2024/25 financial year) Stage 2 - Construction of the new bridge (anticipated timeframe - during the dry season (Nov - Apr) of 2025/26 | Department of Biodiversity, Conservation and Attractions | $2,135,906 |
| WA-MRWA0156240013 | Substructure and superstructure repairs to 5 timber bridges; 0456, 0507, 3541, 3735 and 4827A. | Main Roads Western Australia | $2,056,868 |
| WA-MRWA0098160139 | Structures 3381A and 4854A Replacement | Main Roads Western Australia | $1,805,833 |
| WA-MRWA0098160141 | Structures 0140, 0247, 0249, 1273, 1294, 3515 and 9128 - Substructure and Superstructure Repairs - South West Region | Main Roads Western Australia | $1,795,996 |
| WA-MRWA0098160142 | Structures 0407, 0417, 0430, 0476 and 3558 ? Substructure and Superstructure Repairs. | Main Roads Western Australia | $1,614,723 |
| WA-MRWA0098160214 | Maintenance and substructure works - Structures 0202, 1041, 3502, 3547A and 3677 | Main Roads Western Australia | $1,375,143 |
| WA-MRWA0098160159 | Structures 3408A 3438 3625 3660 3922 and 4860 - Substructure and Superstructure Repairs - South West Region | Main Roads Western Australia | $1,287,723 |
| WA-MRWA0098160137 | Structures 0881, 3085, 3665A, 3671A and 3701 -Substructure and Superstructure Repairs | Main Roads Western Australia | $1,257,848 |
| WA-MRWA0098160260 | Timber bridge 0512 - Minor substructure repairs. Timber bridge 1380 - Superstructure repairs and Preventive Maintenance. Timber bridge 0140 - Substructure and superstructure repairs. Concrete bridge 1319 - L3 inspection, substructure and superstructure repairs. Timber bridge 3958A - Substructure repairs. Concrete bridge 1379 - Superstructure repairs and Preventative Maintenance | Main Roads Western Australia | $1,027,107 |
| WA-MRWA0098160117 | Emergency Halfcap strengthening and pile repairs | Main Roads Western Australia | $929,383 |
| WA-MRWA0098160100 | Substructure repairs including minor earthworks, scour protection and corrosion protection works. Structures 3235, 3297, 3566, 3570 and 3678 . | Main Roads Western Australia | $870,629 |
| WA-MRWA00981678 | Brief Description: Refurbishment and maintenance of Structures 4284A, 0489, 0272 - Great Southern Region | Main Roads Western Australia | $852,037 |
| WA-MRWA0098160217 | Repair and Maintenance including pile repair and replacement, corbel replacement, stringer and beam repairs and replacement, rock protection, guardrail repair, anti-graffiti coating, repairs of balustrades, kerbing and drainage works for Bridge Nos. 0172A, 0252, 1370, 1384, 1613 & 1614 | Main Roads Western Australia | $669,407 |
| WA-MRWA0098160096 | Substructure repairs including minor earthworks, timber remediation, kerbing steel pile driving and steam diversion works. Structures 3313, 3616, 3488, 3523 and 3800. | Main Roads Western Australia | $616,841 |
| WA-MRWA0098160079 | Propping of bridge to undertake repairs. Halfcap replacement. Abutment pile pots (with concrete sheeting repairs. Wing wall pile pots. Pier pile pots. Replacement of undersized halfcap. Corbel repair. Timber packing to bridge abutments | Main Roads Western Australia | $411,938 |
| WA-MRWA0098160076 | Replace existing bridge with a boxed culvert, minor associated road works and channel realignment. | Main Roads Western Australia | $321,804 |
| WA-MRWA0098160089 | Substructure repairs, head room clearance excavation, new concrete overlay , guard rail upgrade, bitumen to approaches and preventative maintenance. | Main Roads Western Australia | $288,556 |
| WA-MRWA0098160086 | Bridge 430 - Type 2A pile repairs, including propping and reattach walers and bracing. Bridge 3306 - Type 2A pile repairs, including propping and reattach walers and bracing Pier 6 Piles 1 and 3. | Main Roads Western Australia | $200,067 |
| WA-MRWA013223 | Emergency Repairs - Bridge 3716 - Forestry Road over Mangosteen Drain | Main Roads Western Australia | $185,000 |
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.