arrow_back Supplier Directory
PW
Protek WA (Protek Carpentry & Fencing Services Pty Ltd)
ABN unknown
Total Won
$1.1M
Contracts
10
Agencies
3
show_chart Government Revenue Over Time
Contract History
| WA-PROMSA26016 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Housing and Works (DHW) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake the supply and installation of threshold ramps at Thornlie Senior High School. The Work includes but is not limited to Supply and install threshold ramps across multiple classrooms at the school. Library Student Services Classroom 602 Classroom 211 | Programmed Facility Management | $158,675 |
| WA-PROPTA26001 | Programmed Facility Management Pty Ltd (PFM) on behalf of Public Transport Authority (PTA) are seeking Quotes from suitably qualified and experienced contractors to undertake flooring works at the Palmyra Depot. The Work includes but is not limited to the upgrade of existing flooring in the admin hallway with carpet tiles, and removal and replacement of external doorway commercial matting. | Programmed Facility Management | $143,824 |
| WA-PROPTA25017A | Programmed Facility Management Pty Ltd (PFM) on behalf of Public Transport Authority (PTA) for Transperth are seeking Quotes from suitably qualified and experienced contractors to design and construct upgrade of workshop bathroom facilities at Southern River Bus Depot. The Works require design and construct upgrade of the current workshop bathroom facilities to suit current operational requirements, including but not limited to: Demolish and remove existing floor and wall tiles, fittings, and fixtures as specified Reconfigure existing configuration and associated services Replace all wall tiles, fittings, and fixtures with new Replace flooring | Programmed Facility Management | $138,383 |
| WA-DOC9601224 | Refurbishment of Lot 277 Unit 1 (52) Wellaton Street, Midvale. | Department of Communities | $130,822 |
| WA-PROPTA26013 | Programmed Facility Management Pty Ltd (PFM) on behalf of Public Transport Authority (PTA) are seeking Quotes from suitably qualified and experienced contractors to undertake air-conditioning and fresh air upgrades at Welshpool Bus Depot. The Work includes but is not limited to removing and disposing of existing mechanical services, then supplying and installing new air-conditioning and fresh-air systems for the specified administration areas. It also includes all associated building works, ensuring ceilings are made good and the area is left neat and clean. | Programmed Facility Management | $127,811 |
| WA-PROMSA25176 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Housing and Works (DHW) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake the widening of doors for disability access and Glencoe Primary School. The Work includes but is not limited to the removal and then installation of 10x disability compliant doors. | Programmed Facility Management | $123,096 |
| WA-GC2500113 | Fitout works for a physical vapour deposition (PVD) Room at The Perth Mint, East Perth. The scope includes demolition, construction, partitions, ceilings, flooring, air-tight sealing, and integration of associated services to deliver a compliant and functional facility suitable for the installation and operation of specialized PVD equipment. | Gold Corporation | $91,964 |
| WA-GC2500129 | Structural work to the physical vapour deposition room | Gold Corporation | $79,960 |
| WA-PROPTA25039 | Programmed Facility Management Pty Ltd (PFM) on behalf of Public Transport Authority (PTA) are seeking Quotes from suitably qualified and experienced contractors to undertake workshop bathroom, locker, lunchroom and office upgrades at Welshpool Bus Depot. The Work includes but is not limited to the demolition and removal of existing vinyl flooring, fittings, and fixtures as specified, making good of all wall tiles in bathroom, bathroom upgrade to basin, fittings and fixtures, general painting throughout all rooms and epoxy to bathroom floor, new vinyl flooring to locker, room and 2 x offices, and deep clean to lunchroom with addition protection in high traffic areas. | Programmed Facility Management | $71,369 |
| WA-GC2500093 | Foundation slab | Gold Corporation | $57,384 |
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.