arrow_back Supplier Directory
NW
Nilsen WA Pty Ltd PO Box 1305 Bibra Lake WA Australia 6965
ABN unknown
Total Won
$14.9M
Contracts
12
Agencies
7
show_chart Government Revenue Over Time
Contract History
| WA-CAHS202618087 | Quotes are invited for the following scope of work, to be undertaken in accordance with the Panel Arrangement HSS304918 - Trade Category: Category B – Electrical Services, Health’s Request Conditions and General Conditions of Contract – Works [June2015]. Description of Works: Child and Adolescent Health Service (CAHS) is seeking to establish a Standing Offer with one Contractor to provide all planned preventative maintenance and reactive maintenance to electrical assets at Perth Childrens Hospital (PCH). Refer to Attachment 1 – CAHS202618087 - Statement of Requirements for further information relating to the scope of the services required. Refer to Attachment 2 – CAHS202618087 - Asset and Pricing Schedule for further information relating to the asset listing and location. | Child and Adolescent Health Service | $10,967,080 |
| WA-DBCABGPA20592025 | The Botanic Gardens and Parks Authority (BGPA) requires suitably qualified and experienced electrical contractors to undertake minor electrical and data network maintenance and installation within Kings Park and Botanic Garden and Bold Park. | Botanic Gardens and Parks Authority | $950,000 |
| WA-P24052C | HBF Stadium MSB1 Switchboard Replacement | VenuesWest | $783,747 |
| WA-HSS202515290 | The Facilities Works project is responsible for delivering essential infrastructure upgrades to support the implementation of CHIIP across Central Communications rooms (CCR) and Floor Communications Rooms (FCR) network enclosures throughout WA Health. At Rockingham General Hospital (SMHS), this initiative encompasses a whole-of-hospital approach. The scope of works includes the installation of CHIIP-required infrastructure, as detailed in Attachment 1: Facilities Solution Design, which outlines the specific tasks forming this project. The scope of key remediation work includes: Deployment of equipment racks and uninterruptible power supplies (UPS). Expansion and replacement of fibre cabling where necessary. Installation of enhanced cooling and ventilation systems. These upgrades are critical to ensuring the reliability and performance of CHIIP infrastructure across the hospital. | Health Support Services | $724,300 |
| WA-23050185004 | East Metropolitain Health Service (EMHS) requires the services of a suitable electrical Contractor to connect and commission the new high voltage switchgear and disconnect and decommission the existing switchgear at Royal Perth Hospital (RPH). | East Metropolitan Health Service | $600,000 |
| WA-EMHS202310113 | In a staged approach, the existing transformers are to be decommissioned, removed and disposed of, and new replacement transformers are to be supplied, installed, and commissioned in their place. We are expecting a turnkey solution to minimise disruption to services and matching incoming and outgoing supplies to minimise cable work. We have a preference for ONAN cooling systems or equal approved. | East Metropolitan Health Service | $311,854 |
| WA-P24052B | HBF Stadium Emergency MSB1 Switchboard Replacement – Supply and install temporary switchboard to replace diesel generator | VenuesWest | $150,583 |
| WA-HSS202615736 | The Critical Health ICT Infrastructure Program (CHIIP) requires works to complete the Enclosure cable remediation at Fremantlle Hospital. | Health Support Services | $114,826 |
| WA-PWST202413552 | PathWest has a requirement for the supply and installation of a 100kVA or better UPS, including all infrastructure upgrades as necessary. | PathWest Laboratory Medicine WA | $108,139 |
| WA-HSS202514595 | The Facilities Works project is responsible for delivering critical facilities works to enable the implementation of CHIIP in communications control rooms (CCR) and network enclosures throughout WA Health. The scope consists of works in CCR Rooms only, which includes installation of UPS, Cable Management, PDUs at KEMH, SCGH, GLH and OPH. | Health Support Services | $104,825 |
| WA-SMHS202413583 | This contract is for the facilities works uplift of Tranche 1 - Small Sites for SMHS. | South Metropolitan Health Service | $57,893 |
| WA-CAHSCCRMAY25 | The Facilities Works project is responsible for delivering critical facilities works to enable the implementation of CHIIP in communications control rooms (CCR) and network enclosures throughout WA Health. The scope consists of Minor Works and Planned Maintenance, specifically, Installation of Fibre Cabling and Network Equipment at Perth Children’s Hospital, CAHS. | Health Support Services | $47,879 |
Agency Relationships
Child and Adolescent Health Service
$11.0M
1 contracts
Health Support Services
$991.8K
4 contracts
Botanic Gardens and Parks Authority
$950.0K
1 contracts
VenuesWest
$934.3K
2 contracts
East Metropolitan Health Service
$911.9K
2 contracts
PathWest Laboratory Medicine WA
$108.1K
1 contracts
South Metropolitan Health Service
$57.9K
1 contracts
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.