arrow_back Supplier Directory
D
Duratec Limited (Duratech Australia Pty Ltd)
ABN unknown
Total Won
$19.4M
Contracts
15
Agencies
8
show_chart Government Revenue Over Time
Contract History
| WA-FINW0300424 | Department of Training and Workforce Development - North Metropolitan TAFE - 30 Aberdeen Street Perth - Aluminium Composite Panel Cladding Remediation. Removal and Replacement of Aluminium Composite Panel Cladding at North Metropolitan TAFE, 30 Aberdeen Street, Perth. | Department of Housing and Works | $4,627,644 |
| WA-DOC9631722 | Stage 2 Concrete Remedial and Hydraulic Works at Lot 215 (93) Thomas Street, Subiaco (Wandana Complex) Stage 2 Concrete Remedial and Hydraulic Works at Lot 215 (93) Thomas Street, Subiaco (Wandana Complex) | Department of Communities | $4,046,998 |
| WA-EMHS202515292 | EMHS requires the removal of the existing membrane (including screed) and provision of a replacement membrane waterproofing system on the Royal Perth Hospital (RPH) R block Level 6 roof, which covers an area of approximately 1,750m2. Level 6 is to be waterproofed and re-surfaced with a heavy-duty trafficable surface overlay to support servicing the RPH helipad directly above. | East Metropolitan Health Service | $2,817,899 |
| WA-FINW0573922 | South Metropolitan Health Service - Fiona Stanley Hospital - Susan Teather Early Development Centre - External Cladding Remediation Project. A non-mandatory site inspection and/or tender briefing will be held on Thursday 11 May at 1.00pm. The tender briefing will provide tenderers the opportunity to clarify any tender enquiries they have in relation to the tender in person prior to the closing of the tender. Attendance by tenderers is not mandatory. To confirm attendance at this briefing, you must contact: John Bui from Paterson Architects on 9485 2122. | (inactive) Department of Finance | $1,895,210 |
| WA-FINW0574022 | South Metropolitan Health Service - Fiona Stanley Hospital - Susan Teather Early Development Centre - External Cladding Remediation Project | (inactive) Department of Finance | $1,895,210 |
| WA-DHW0286325 | Department of Creative Industries, Tourism and Sport - WA Maritime Museum Partial ACP Replacement | Department of Housing and Works | $1,548,695 |
| WA-MWSP13CON2022 | The North Metropolitan Health Service (NMHS) requires the refurbishment of rooftop Waterproofing Membranes (WPM) of the B Block building at King Edward Memorial Hospital, Subiaco, Western Australia. | North Metropolitan Health Service | $1,151,045 |
| WA-DHW0573924A | Department of Education - Bunbury Senior High School - Aluminium Composite Panel Cladding Remediation Works. | Department of Housing and Works | $512,562 |
| WA-BMW0485719 | Department of Health - Royal Perth Hospital Block A Level 7 - Cladding Replacement A non-mandatory site inspection and/or tender briefing will be held on Thursday 1 October 2020 at 9am. The tender briefing will provide tenderers the opportunity to clarify any tender enquiries they have in relation to the tender in person prior to the closing of the tender. To confirm attendance at this briefing, you must contact: Kevin Truscott, Project Officer: kevin.truscott@finance.wa.gov.au . Please meet at the Wellington Street entry, under the pedestrian bridge, 15 minutes before the designated meeting time, so names can be included on the attendee list. | (inactive) Department of Finance | $354,332 |
| WA-MWSP13CON2021 | North Metropolitan Health Service (NMHS) requires the provision of rooftop waterproof membrane replacement to Heritage-listed Agnes Walsh House (Q Block) at King Edward Memorial Hospital (KEMH). | North Metropolitan Health Service | $260,000 |
| WA-DOC2024001REM | Removal of 26 x non-compliant balcony enclosures and make good at 93 Thomas Street, Subiaco (Wandana Flats Complex). | Department of Communities | $93,830 |
| WA-GC2500098 | Wall Demolition | Gold Corporation | $78,787 |
| WA-FINW0265224 | Main Roads Western Australia - Don Aitken Centre - Façade Reinvestigation. | (inactive) Department of Finance | $60,222 |
| WA-ZPA1494724 | Supply and install of wire cable bracing to existing timber pole structure for reinforcement within the Gibbon enclosure. | Perth Zoo | $55,514 |
| WA-ED240663 | 3D Reality Model - Hosting and Access Service Arrangement | Department of Education | $46,574 |
Agency Relationships
Department of Housing and Works
$6.7M
3 contracts
(inactive) Department of Finance
$4.2M
4 contracts
Department of Communities
$4.1M
2 contracts
East Metropolitan Health Service
$2.8M
1 contracts
North Metropolitan Health Service
$1.4M
2 contracts
Gold Corporation
$78.8K
1 contracts
Perth Zoo
$55.5K
1 contracts
Department of Education
$46.6K
1 contracts
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.