arrow_back Supplier Directory
TP
Total Project Solutions (Symmons Nominees Pty Ltd)
ABN unknown
Total Won
$12.1M
Contracts
27
Agencies
5
show_chart Government Revenue Over Time
Contract History
| WA-CAHS20194782 | The Child and Adolescent Health Service requires the provision of alteration works to the Emergency Department (ED) at the Perth Children?s Hospital. | Child and Adolescent Health Service | $1,464,307 |
| WA-NMHS20205597CON2021 | NMHS requires Mechanical, Electrical and Hydraulic services for upgrades to support the new sterilisers and address compliance requirements for the Central Sterile Services Department (CSSD). | North Metropolitan Health Service | $1,301,925 |
| WA-NMHS20206407 | The North Metropolitan Health Service requires the re-configuration of part of Ward G75 to accommodate a new procedure room and associated supporting services | North Metropolitan Health Service | $1,012,992 |
| WA-19059841006 | P010 AHS- Fire and Smoke Wall Compartments/Construction | East Metropolitan Health Service | $974,660 |
| WA-NMHS20205422 | Provision of a design and construct service for the new Fast Track and Isolation Room at SCGH | North Metropolitan Health Service | $785,073 |
| WA-MWSP27CON2021 | The Works involve the upgrade to the fire protection and other building services provisions in the Medical Records department and fit-out of office spaces at Osborne Park Hospital. | North Metropolitan Health Service | $691,301 |
| WA-CAHS20194877 | Child and Adolescent Health Service requires the services of a suitably qualified builder to undertake alterations to the Pathways service located at 233 Stubbs Terrace, Shenton Park WA 6008 | Child and Adolescent Health Service | $607,964 |
| WA-MWSP48BCON2021 | The works include major refurbishment of the existing Male, Female and Universal Access public toilets, staff toilet & change room on the ground & first floor of E block Outpatient Department | North Metropolitan Health Service | $452,863 |
| WA-17058702 | Armadale Health Service Q Block Level 2 Neonatal Nursery | East Metropolitan Health Service | $432,898 |
| WA-MWSP7CON2021B | The North Metropolitan Health Service (NMHS) requires the refurbishment works to the Genetic Services on level 3 of Heritage listed, Agnes Walsh House (AWH) at King Edward Memorial Hospital, Subiaco, Western Australia. | North Metropolitan Health Service | $420,692 |
| WA-PWST20194107 | PathWest Executive Office Fitout Works Level 2 Pathology Building, Fiona Stanley Hospital | PathWest Laboratory Medicine WA | $373,956 |
| WA-MWSP48ACON2020 | The works include major refurbishment of the existing Male, Female and Universal Access public toilets on Watling Street and the construction of a new Staff Toilet, Parents Room and Changing Places facility on E Street. | North Metropolitan Health Service | $364,743 |
| WA-CAHS20218366 | Quotes are invited for the Construction of a new Family Lounge at Perth Children?s Hospital to be undertaken in accordance with the Panel Arrangement HSS304918. | Child and Adolescent Health Service | $353,911 |
| WA-BMW0373319 | Department of Primary Industries and Regional Development - WA Fisheries and Marine Laboratories - Brood Stock Tanks and Compound. Site Visit: A non-mandatory site inspection and/or tender briefing will be held on Tuesday 11 February at 2pm.To confirm attendance at this briefing, you must contact: James Allison, telephone no. (08) 6551 1534. | (inactive) Department of Finance | $323,611 |
| WA-20031949003 | East Metropolitan Health Service (EMHS) seeks to upgrade capability by converting Room 10116 to a single bariatric room and ensuite. Room 10116 is located on Level 10 of A Block within the Royal Perth Hospital (RPH) Campus. | East Metropolitan Health Service | $316,068 |
| WA-20023951016 | To carry out works in existing patient rooms to create 2 negative pressure isolation rooms that comply with WAHFG type 5 isolation room requirements. One negative pressure room being part of the ICU area and the other in Canning Ward. | East Metropolitan Health Service | $311,977 |
| WA-CAHS20218138 | CAHS20218138 Perth Children's Hospital Main Entrance and Western Facade Protection Upgrade | Child and Adolescent Health Service | $286,593 |
| WA-CAHS20194446 | The Child and Adolescent Health Service requires the services of a suitably qualified builder to undertake alterations to the Orthotics Workshop at the Perth Children?s Hospital | Child and Adolescent Health Service | $239,607 |
| WA-NMHS202210825 | North Metropolitan Health Service (NMHS) is seeking offers for the provision of a Builder to undertake the refurbishment works located on Level 1 R Block QEII Medical Centre. | North Metropolitan Health Service | $234,893 |
| WA-NMHS20193613MWSP34 | The project objective is to upgrade patient bathrooms and to replace the old cast iron soil stacks with new PVC or acoustic rated pipe material to enable easier connection of future toilet fixtures. Quotes to be sought from whole of Health panel contract HSS304918 as per published Buying Rules of Contract | North Metropolitan Health Service | $230,550 |
| WA-19033669003 | RPH Maxillofacial Refurbishment | East Metropolitan Health Service | $187,879 |
| WA-MWSP1CCON2021 | Quotes are invited for the refurbishment and associated works of the ENT Sterile Store and General Store Room. For any queries please contact Russel Dsilva, Senior Project Officer on (08) 9457 3640 or email russel.dsilva@health.wa.gov.au. | North Metropolitan Health Service | $175,119 |
| WA-QEII20200187 | The OSH Office at QEII, R Block Level 3, requires the removal and replacement of existing carpets and associate repairs works as per the scope of works in the Request document. | North Metropolitan Health Service | $151,047 |
| WA-PWSTMW1920020 | IHC Laboratory Refurbishment Works for PathWest Laboratory Medicine WA | PathWest Laboratory Medicine WA | $139,848 |
| WA-PWSTMW1920014a | Refurbishment to Level 2 Toilet Area, J Block QEII, PathWest Laboratory Medicine WA Site Briefing visit will be held 13th May 2021 at 10:30am. Please confirm attendance by emailing Lesley.Richardson@health.wa.gov.au or phone 08 6457 2387. Scope of Works to include the following: -Painting (incl ceiling pipes and doors) -New fittings and fixtures -New flooring -New door locks on cubicles -LED lighting -Vanity bench (noting no existing bench) -Shop Drawings for BCA Compliance Optional Requirement: BA03 Certificate of Design Compliance Service Drawings Completion of Building Permit application Note: PathWest to provide design drawings (as per attachments) | PathWest Laboratory Medicine WA | $128,727 |
| WA-QEII20190151 | A sink hole has opened up between Blocks A and G at QEII Medical Centre. North Metropolitan Health Services (NMHS) requires rectification works to address the sink hole in accordance with a structural report that has been obtained by NMHS. | North Metropolitan Health Service | $59,275 |
| WA-MWSP18CON2021 | The North Metropolitan Health Service requires the installation of roof anchor and access points at Osborne Park Hospital (OPH) to comply with current Australian Standards AS/NZS 1891, AS/NZS 5532 and Workcover CODE OF PRACTICE Prevention of falls from height at workplaces. | North Metropolitan Health Service | $52,855 |
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.