arrow_back Supplier Directory
AH
Australian HVAC Services (Australian HVAC Services Pty. Ltd.)
ABN unknown
Total Won
$12.2M
Contracts
37
Agencies
7
show_chart Government Revenue Over Time
Contract History
| WA-NMHS20190029 | The North Metropolitan Health Service (NMHS) requires the maintenance of chillers for the reticulated chilled water systems located at NMHS managed sites as detailed in this Request. | North Metropolitan Health Service | $1,938,378 |
| WA-19077673001 | Bentley Health Service Redevelopment - Mechanical Upgrades | East Metropolitan Health Service | $1,201,870 |
| WA-1908271315001 | Supply and installation of air conditioning at Bentley Hospital. | East Metropolitan Health Service | $1,114,377 |
| WA-190271315001 | Bentley Health Service Redevelopment - Air-conditioning Upgrades | East Metropolitan Health Service | $1,114,377 |
| WA-MW25009 | North Metropolitan Health Service (NMHS) is seeking offers for the replacement of 3 AC systems at the Fitzroy Ward at Graylands Hospital. | North Metropolitan Health Service | $851,521 |
| WA-190827141719001 | Bentley Health Service Redevelopment - Central Plant Upgrades | East Metropolitan Health Service | $811,877 |
| WA-25088664002 | East Metropolitan Health Service (EMHS) seeks the supply, installation and commissioning of replacement hot and chilled water coils in various locations across the RPH site. | East Metropolitan Health Service | $646,816 |
| WA-23066524001 | The Armadale Health Service (AHS) requires a contractor to remove, dispose, and the replacement of the existing Low Load Chiller. | East Metropolitan Health Service | $581,208 |
| WA-CAHS202210324 | CAHS are seeking a new HVAC system, which will include individual room split air conditioning systems serving the various rooms as summarised in the table below. Pre-treated outside air will be provided via 4-off Energy Recovery Ventilators (ERV). | Child and Adolescent Health Service | $416,000 |
| WA-NMHS20206636Con | KEMH Condenser Water treatment Plant Relocation from Level 7 Plant room to the lower ground area near loading bays.KEMH Condenser Water treatment Plant Relocation from Level 7 Plant room to the lower ground area near loading bays. | North Metropolitan Health Service | $319,473 |
| WA-MW24039CON | North Metropolitan Health Service (NMHS) is seeking offers for the replacement of 3 AC systems at the Murchison Unit Inpatient Ward at Graylands Hospital. | North Metropolitan Health Service | $274,890 |
| WA-NMHS20206636Construc | Relocation of Water treatment plant to lower dock area | North Metropolitan Health Service | $274,318 |
| WA-P24005 | HBF Arena Premier Suite Air Conditioning Upgrade | VenuesWest | $214,962 |
| WA-20HA04A | HBF ARENA SWIMMING POOL HEATER (BOILER) REPLACEMENT The project works includes but not limited to the following: • Supply and Installation of two new boilers; • Connection of flow and return lines; • Installation of control valve; • Reconnect has lines; • Install new flue using roof penetration; • Provide new variable speed drives to pumps; • Electrical connection works; • Testing and commissioning; and • Operating manual and trainings. | VenuesWest | $176,187 |
| WA-P22060 | Bendat Basketball Centre Water Heater Boiler | VenuesWest | $164,329 |
| WA-WAPOL21624 | The Western Australia Police Force (The Customer) is seeking offers for a vendor to replace two existing Air-conditioning units at the Gosnells Police Station. | Western Australia Police Force | $152,724 |
| WA-MW24036MECH | The contractor is required to carry out the works as detailed in this document and the accompanying documents and drawings which together form a single comprehensive document. | North Metropolitan Health Service | $147,620 |
| WA-M25002C | HBF Park Lounge and Gareth Naven HvAC Upgrade | VenuesWest | $144,859 |
| WA-RFQWA6516303 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Fire and Emergency Services (DFES) are seeking quotes from suitably qualified and experienced contractors to undertake CRAC Unit Replacement at Cockburn DFES. The Work includes but is not limited to the replacement of the CRAC Unit 1.1B in the Comcen Server Room. | Programmed Facility Management | $135,500 |
| WA-RFQWA4382434 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Justice (DOJ) are seeking quotes from suitably qualified and experienced contractors to undertake Safe Platform Works for serving A/C at Perth Children?s Court | Programmed Facility Management | $132,430 |
| WA-NMHS20193884 | The Osborne Park Hospital (OPH) have reported ongoing performance issues with Air-Conditioning units servicing B Block Administration and radiology areas and are utilising a condenser coil wetting routine to try to temporarily resolve the performance issues. These units are approximately 26 years old and are well beyond their economic serviceable life. In view of this, a commercial air-conditioning specialist will be engaged to remove, supply and install replacement three (3) split DX air-conditioning units: AC.2 (APAC S35 CEL) AC.3 (APAC S35 CEL) AC.4 (APAC S18 CEL) | North Metropolitan Health Service | $117,337 |
| WA-20229217CONS | QE11 Medical Centre UU Block Treatment Room AC | North Metropolitan Health Service | $109,285 |
| WA-NMHS202615765 | Remove and replace internal insulation to both A/C units, provide rust treatment to both A/C units. Supply, remove existing and install new ac heating/cooling coils. Remove, supply and install new stainless steel filter housing frames with new filters to both A/C units. | North Metropolitan Health Service | $109,142 |
| WA-P21023 | Northern Concourse Toilet & Kiosk Exhaust System at HBF Stadium | VenuesWest | $107,360 |
| WA-NMHS202514443 | Replace exsitng A/C 1 Fitzroy House with new A/C unit. | North Metropolitan Health Service | $99,363 |
| WA-P24008 | WA Rugby AC Condenser Coil Replacement | VenuesWest | $93,653 |
| WA-RFQWA5307758 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake BMS Removal Works at Harmony Primary School. The work detailed in this Specification describes the work required for the removal of the Building Management System (BMS) serving Harmony Primary School, Aurora Drive, Atwell, Western Australia and replacement with electric/electronic controls complying with the Primary School Brief. All work shall be performed during the holiday period between the 2022 and 2023 school years. | Programmed Facility Management | $83,436 |
| WA-NMHS202514990 | Replacement of Air-Conditioning Equipment due to age and life expectancy | North Metropolitan Health Service | $81,000 |
| WA-RFQWA3082792 | Programmed Facility Management Pty Ltd (PFM) on behalf of Building Management and Works (BMW) and Department of Education (North) are seeking quotes from suitably qualified and experienced contractors to undertake transportable AC Works at Mindarie SC. | Programmed Facility Management | $77,200 |
| WA-NMHS202412839 | Pre inspection and Dilapidation report prior to starting works De-commission and safe removal of existing indoor and outdoor units + pipe work Supply, installation and commissioning OFF 1 X vertical ducted split apac system Supply and installation of new S/A duct system Supply and installation of new interconnecting pipe work and electrical services Commissioning and air balance to dilapation report | North Metropolitan Health Service | $70,000 |
| WA-QEII20200263 | The NMHS FM requires the supply, delivery and installation of the carbon and multi-pocket (bag) filters for A/C 3 and A/C 7 at ?G? Block, QEII MC. The details of the contract requirement are divided into 2 phases and are as follows: Phase 1 - The Contractor will need to first remove any and all existing filters and frames; and Phase 2 - Multi-Pocket (Bag) Filters (as primary filters) and Carbon Filters (as secondary filters). | North Metropolitan Health Service | $68,753 |
| WA-SMHS20218791 | Capital funding has been provided to replace 20 x ground floor FCU units in the patient areas. The FCU?s are run from boiled and chilled water supply pipes on a single loop system. | South Metropolitan Health Service | $68,618 |
| WA-OPH20230004 | Replacement of B Block Reception air conditioner at Osborne Park Hospital (OPH) | North Metropolitan Health Service | $63,822 |
| WA-RFQWA7133273 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake EC Rev Cycle Aircon at Hollywood Primary School. The Work includes but is not limited to Supply and Install New Reverse Cycle Air Conditioners Replacing Evaporative Units to each classroom currently serviced by the Evaporative Air Conditioners as listed below. - Location as listed : o Block F ? Rooms F3, F8, F10. | Programmed Facility Management | $58,750 |
| WA-NMHS202210338 | OPH Kitchen Ventilation Upgrade | North Metropolitan Health Service | $53,702 |
| WA-NMHS202210348Constru | Kitchen Ventilation Upgrade Supply and Installation at B Block Osborne Park Hospital. | North Metropolitan Health Service | $46,222 |
| WA-QEII20190140 | North Metropolitan Health Service is seeking the services of a suitable contractor to r eplacement of cooling coil and minor refurbishment of A/.C-12 G Block. Due to the age, the condition of the unit has deteriorated which is affecting the performance of the A/C. This unit serves Theatres 11 and 12 in G Block and is located on level 3 plant room. | North Metropolitan Health Service | $36,245 |
Agency Relationships
East Metropolitan Health Service
$5.5M
6 contracts
North Metropolitan Health Service
$4.7M
17 contracts
VenuesWest
$901.4K
6 contracts
Programmed Facility Management
$487.3K
5 contracts
Child and Adolescent Health Service
$416.0K
1 contracts
Western Australia Police Force
$152.7K
1 contracts
South Metropolitan Health Service
$68.6K
1 contracts
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.