arrow_back Supplier Directory
EM
Equans Mechanical Services Australia (Equans Mechanical Services Australia Pty Ltd)
ABN unknown
Total Won
$5.4M
Contracts
19
Agencies
4
show_chart Government Revenue Over Time
Contract History
| WA-EOIPRO13823RFQ | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake replacement of evaporative air conditioning units with refrigerated units at Byford Secondary College. The Work includes but is not limited to replacing existing evaporative heat & cooling units with refrigerated units across a number of blocks at Byford Secondary College. Bidders shall make themselves familiar with the existing site conditions, the specifications, drawings and all Contract documentation. All measurements and details shown on drawings or other documents (if any) are to be confirmed by bidders prior to submission of their Quote. All materials and installation shall be supplied and be in accordance with Australian Standards and all codes and regulations relevant to the Scope of Work contained herein. | Programmed Facility Management | $1,028,548 |
| WA-WACHS202311308 | WACHS South West Region is seeking to establish a service agreement to provide ongoing planned preventative maintenance to optimise the operability of the HVAC and mechanical services plant which is critical to the day-to-day business operations and clinical services within the Busselton Health Campus (BHC). The work to be performed comprises the inspection, maintenance and reporting on the plant and equipment at the BHC. The work is to be carried out and reported in accordance with the service schedules and details contained within Schedule 2 - Specification. | WA Country Health Service | $1,011,735 |
| WA-PROMSA25154x | PROMSA25154 was closed in error too early, this is the duplicate to allow uploads. | Programmed Facility Management | $667,062 |
| WA-PROMSA25041 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Local Government, Sport and Cultural Industries (DLGSC) are seeking quotes from suitably qualified and experienced contractors to undertake submarine air-con system replacement works at WA Maritime Museum. The Work includes but is not limited to demolition works, the supply and installation of new air-conditioning system, involved mechanical works, electrical works, engineering, and commissioning. | Programmed Facility Management | $564,268 |
| WA-PROMSA25193 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Housing and Works (DHW) and Department of Education are seeking tenders from suitably qualified and experienced contractors to undertake Mechanical Upgrades to Library, Café and Block C (C1 & C10) at Byford Secondary College. The Work includes but is not limited to the supply, delivery, installation, testing, and commissioning of the mechanical services as detailed in PROMSA25193 - Annexure 1 – Scope, Specifications and Drawings for the following buildings/blocks listed below: Library Café Block C (C1 & C10) | Programmed Facility Management | $408,109 |
| WA-EMHS202413525 | Maintenance and Testing Services for Fire Protection Systems at Bentley Health Services (BHS), Armadale Health Service (AHS) & Kalamunda Hospital (KH) | East Metropolitan Health Service | $270,711 |
| WA-PROMSA25109 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Housing and Works (DHW) and Department of Education are seeking tenders from suitably qualified and experienced contractors to undertake supply and install of inverter type split system air conditioners in classrooms at Koondoola PS. The Work includes but is not limited to: Decommission; Removal; and Make good of all relevant areas. A/C Upgrade to Blocks L & F, works to commence Dec holidays and completed by Jan 30th 2026 There is no mechanical drawing or consultant for this project A Power upgrade and switchboard replacement project to commence Dec 2025 alongside this project Sufficient power capacity for Block L & F Additional Blocks I and K to be priced – potentially to be scheduled for April 2026 holidays There are no school holiday programs or OSH club during December break Tender site brief scheduled for Oct 13th after September school holidays due to staff availability, this is a pupil free day and access to all areas | Programmed Facility Management | $251,876 |
| WA-RFTPRO6123 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance and Department of Local Government, Sport and Cultural Industries (DLGSC) are seeking Tenders from suitably qualified and experienced contractors to undertake Cooling Towers 1 & 2 Refurbishment at Perth Cultural Precinct. The Work includes but is not limited to the replacement of mechanical equipment in a like for like scenario to ensure the future operation of the towers is not compromised. | Programmed Facility Management | $163,294 |
| WA-RFQWA8599650 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake Supply and Install of New Reverse Cycle Air Conditioners replacing Evaporative Units at Creaney Education Support Centre. Supply and install inverter type split air conditioners to each classroom currently serviced by the Evaporative Air Conditioners as listed below. Please note that all works are scheduled for completion during the July school term break, however alternative options will be considered if optional works cannot be accomplished. - Installation of New A/C Split systems - Optional Works: Removal of existing evaporative units (internal and external) and existing gas heaters Works. Please allow optional works to be completed after hours work or advise feasible completion date. - Locations as listed: Education Support Center – Rooms F4, F5, F8 and F6 (Common Area) | Programmed Facility Management | $149,390 |
| WA-PROMSA25177 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Housing and Works (DHW) and Department of Education (DOE) are seeking quotes from suitably qualified and experienced contractors to undertake air-conditioning upgrades at North Woodvale Primary School. The Work includes but is not limited to decommissioning and removal of existing units, the supply and install of inverter type split systems air conditioners to classrooms, and making good. | Programmed Facility Management | $135,078 |
| WA-PROMSA25182 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Housing and Works (DHW) and Department of Education (DOE) are seeking quotes from suitably qualified and experienced contractors to undertake gas heaters & air conditioning works at East Wanneroo Primary School. The Work includes but is not limited to the supply and install of inverter type split systems air conditioners and fresh air intake to each classroom in B Block and W Block currently serviced by Evaporative Air Conditioners. Gas heaters and evaporative units are to be removed and disposed of. | Programmed Facility Management | $129,651 |
| WA-RFQWA7566029 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake Install New Reverse Cycle Air Conditioners at Illawarra Primary School. The Work includes but is not limited to Supply and install inverter type split air conditioners to each classroom currently serviced by the Evaporative Air Conditioners as listed below. - Locations as listed: Rooms 9 to 12 Music Room | Programmed Facility Management | $110,737 |
| WA-RFQWA6981907 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake Supply and Install New Reverse Air Conditioners at Como Secondary College. The Work includes but is not limited to Supply and install inverter type split air conditioners to each classroom currently serviced by the Evaporative Air Conditioners as listed below. - Locations as listed: Block AA (Rooms AA14, AA19) Block M (Rooms M20, M21). | Programmed Facility Management | $95,780 |
| WA-RFQWA6972134 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake Replacing Evaporative Units at Armadale Senior High School. The Work includes but is not limited to Supply and install inverter type split air conditioners to each classroom currently serviced by the Evaporative Air Conditioners as listed below. - Locations as listed: o Block X (Rooms X4, X5, X6 and X7). | Programmed Facility Management | $93,132 |
| WA-RFQPRO4423 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake Install Air Conditioning in TB1 at Yuluma Primary School. The Work includes but is not limited to Supply and install inverter type split air conditioners to each of the four classroom and one staffroom to provide fresh air fans to operate when air con is turned on. Each indoor fan coil unit to be wall mounted on and each fan coil unit to have its own condenser. | Programmed Facility Management | $85,045 |
| WA-RFQWA6414667 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake Replacement of Duct Works on 4 Evaporative units in the Library at Atwell College. Supply and Install Air Conditioning Duct Works to four (4) Evaporative Cooler Systems serving the Library. | Programmed Facility Management | $75,024 |
| WA-RFQWA7083592 | Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake AC Upgrade Works at the Carlisle Primary School Early Childhood Block (Block U). Supply and install inverter type split air conditioners to each classroom currently serviced by the Evaporative Air Conditioners. Locations as listed: Early Childhood Block (Block U) NOTE: Contractor is to inspect the switchboard for the designated blocks and determine if there is sufficient capacity for the new split units once the evaporative circuits are deleted. | Programmed Facility Management | $70,209 |
| WA-FINW0503723 | Main Roads WA - Southern Region - Bunbury Office - Mechanical Repairs - Stage 1 | (inactive) Department of Finance | $63,998 |
| WA-FINW0503723A | Main Roads WA - Bunbury Essential Mechanical Repairs - Stage 2 | (inactive) Department of Finance | $57,618 |
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.