arrow_back Supplier Directory
RC
RAUBEX Construction Pty Ltd 73-75 Dowd Street Welshpool WA Australia 6106
ABN unknown
Total Won
$271.3M
Contracts
28
Agencies
3
show_chart Government Revenue Over Time
Contract History
| WA-MRWA0197180043 | Construct Two Roundabouts on Thomas Road | Main Roads Western Australia | $31,557,900 |
| WA-MRWA0197180061 | Realigning Hearson Cove Road, widening of Burrup Peninsula Road, construction of a new Hearson Cove Road /Burrup Peninsula Road intersection and a new access way to the proposed Perdaman Urea Plant Site C (Access Road 2), including drainage upgrading, construction of new retaining walls, lighting and other ancillary works. Pre-qualification Required - R3 / B2 this a Commonwealth Funded Contract that requires compliance with the Australian Govt Building and Construction WHS Accreditation Scheme It is a requirement of this project that any persons contracted to undertake the building work be accredited under the Australian Government Building and Construction WHS Accreditation Scheme established by the Building and Construction (Improving Productivity) Act 2016, at the time of the tender closing for the building work and while the building work is being carried out. Tenderers intending to submit a bid as a Joint Venture must review the additional requirements as outlined by Section 26(1)(f) of the Fair Work (Building Industry ? Accreditation Scheme) Regulations 2016 by the Federal Safety Commission (located at http://www.fsc.gov.au ) | Main Roads Western Australia | $26,407,190 |
| WA-MRWA0197180036 | Shoulder Widening and Construction of Two Parking Bays. Pilbara Network - North West Coastal Highway | Main Roads Western Australia | $22,045,896 |
| WA-MRWA0197180096 | Construction of Shoulder Widening (GNH & NWCH) and Installation of W-beam barrier at bridge 0842 on NWCH - Pilbara Region Great Northern Highway H006 (SP2) Northwest Coastal Highway H007 (SP1) | Main Roads Western Australia | $17,990,060 |
| WA-DBCA423WT3472023T | The scope of works includes, but not limited to; Gravel Production from within Karijini National Park Earthworks and construction of drainage including rock armouring of road side drains. Innovative methods to maximise reuse of existing road surface materials and reduce environmental impact e.g. surface mining methodology or similar alternatives are required; Weano Road and Banjima Drive will involve cement stabilisation of floodways; Large portions of the road construction are proposed to be carried out with a surface miner or similar alternative; Construction of the gravel basecourse pavement layer; Construction of a two-coat bitumen emulsion seal; Installation of painted pavement marking; Supply and installation of steel wheel stops and steel bollards; Supply and installation of road signs; Construction of the cement stabilised gravel footpaths and standard compacted gravel footpaths; Rehabilitation of lands impacted by the works, i.e. turn arounds and gravel pits etc Weano Road from Banjima Drive North to the car park at Weano Gorge including Sealing of part of the Karijini Eco Retreat driveway Banjima Drive North from the Karijini Visitor Centre to Joffre Road Knox Road from Joffre Falls turn off to Knox Gorge car park Kalamina Road from Banjima Drive North to the car park at Kalamina Gorge Weano Gorge car park Fortescue Falls car park Kalamina Gorge car park Knox Gorge car park Joffre Gorge car park Dales Road widening of sections of shoulder and resealing sections Resealing sections of car park at the Karijini Visitor Centre Resealing sections of Banjima Road East Modern technologies and methodologies are sought to create reusable road base materials out of existing rocky road surfaces, thereby reducing the need to source road base materials from the gravel pits located within Karijini. Karijini is a high profile National Park and dust and vibration mitigation is an important issue within the park. Contractors should address this issue in their tender submission. | Department of Biodiversity, Conservation and Attractions | $16,781,449 |
| WA-MRWA011319 | Construction of Bussell Highway Duplication Stage 1, SLK 25.75-31.30, Capel to Hutton section (Shire of Capel). Includes construction of second road carriageway and road rehabilitation of existing carriageway, associated drainage, guardrail, lighting and ancillary works. Prequalification: Roadworks Category R2 or Higher The Code for the Tendering and Performance of Building Work 2016 (Building Code) applies to the building work associated with this project. By submitting an expression of interest in, or tender for, this project, you will become subject to the Code for the Tendering and Performance of Building Work 2016. Refer to the Building Code at employment.gov.au/building-code for further information It is a requirement of this project that any persons contracted to undertake the building work be accredited under the Australian Government Building and Construction WHS Accreditation Scheme established by the Building and Construction Industry Improvement Act 2016, at the time of the Tender closing for the building work and while the building work is being carried out. Tenderers intending to submit a bid as a Joint Venture must review the additional requirements as outlined by Section 26(1)(f) of the Fair Work (Building Industry – Accreditation Scheme) Regulation 2016 by the Federal Safety Commission (located at http://www.fsc.gov.au ).” | Main Roads Western Australia | $14,200,834 |
| WA-MRWA0197180153 | H006 GNH Shoulder Reconditioning and Sealing SLK 631.04 – 669 | Main Roads Western Australia | $13,818,492 |
| WA-MRWA0197180037 | Place Asphalt on Shoulders, Audible Edge Line ? Goldfields Highway (Menzies to Leonora) The Code for the Tendering and Performance of Building Work 2016 (Building Code) applies to the building work associated with this project. By submitting an expression of interest in, or tender for, this project, you will become subject to the Code for the Tendering and Performance of Building Work 2016. Refer to the Building Code at employment.gov.au/building-code for further information It is a requirement of this project that any persons contracted to undertake the building work be accredited under the Australian Government Building and Construction WHS Accreditation Scheme established by the Building and Construction (Improving Productivity) Act 2016, at the time of the Tender closing for the building work and while the building work is being carried out. Tenderers intending to submit a bid as a Joint Venture must review the additional requirements as outlined by Section 26(1)(f) of the Fair Work (Building Industry ? Accreditation Scheme) Regulations 2016 by the Federal Safety Commission (located at http://www.fsc.gov.au ) | Main Roads Western Australia | $12,928,011 |
| WA-MRWA0197180044 | Construction of Thomas Rd Duplication and Roundabout from Kwinana Freeway to past Bombay Boulevard | Main Roads Western Australia | $11,389,433 |
| WA-MRWA0197180090 | Goldfields Highway (H049) Place Asphalt on Shoulders - Audible Edge Line – SLK146.8 to SLK203.51 - Goldfields Esperance Region Pre-Qualification required- R2 This a Commonwealth Funded Contract that requires compliance with the Australian Govt Building and Construction WHS Accreditation Scheme - It is a requirement of this project that any persons contracted to undertake the building work be accredited under the Australian Government Building and Construction WHS Accreditation Scheme established by the Building and Construction (Improving Productivity) Act 2016, at the time of the Tender closing for the building work and while the building work is being carried out. Tenderers intending to submit a bid as a Joint Venture must review the additional requirements as outlined by Section 26(1)(f) of the Fair Work (Building Industry – Accreditation Scheme) Regulations 2016 by the Federal Safety Commission (located at http://www.fsc.gov.au ) | Main Roads Western Australia | $10,266,364 |
| WA-MRWA0197180049A | Road Widening and Reconstruction, Albany Highway | Main Roads Western Australia | $9,735,316 |
| WA-MRWA0197180020 | Brookton Highway (H052) Seal Shoulders - SLK 12.20 to 110.00 | Main Roads Western Australia | $8,249,508 |
| WA-MRWA0197180022 | Construction of Seal Widening ? Brand Hwy (H004) 86 to 152 SLK | Main Roads Western Australia | $7,497,141 |
| WA-MRWA0197180101 | Seal Widening including Culvert Extensions - NORTHAM PITHARA (M032) - Wheatbelt Region - SLK 27.00 to 44.50 Widen and ex-situ bitumen stabilise the shoulders with 2 coat seal, targeted drainage works and install audible edge lines Pre-Qualification Required - R2 This a Commonwealth Funded Contract that requires compliance with the Australian Govt Building and Construction WHS Accreditation Scheme “ It is a requirement of this project that any persons contracted to undertake the building work be accredited under the Australian Government Building and Construction WHS Accreditation Scheme established by the Building and Construction (Improving Productivity) Act 2016, at the time of the Tender closing for the building work and while the building work is being carried out. Tenderers intending to submit a bid as a Joint Venture must review the additional requirements as outlined by Section 26(1)(f) of the Fair Work (Building Industry – Accreditation Scheme) Regulations 2016 by the Federal Safety Commission (located at http://www.fsc.gov.au ) | Main Roads Western Australia | $7,241,921 |
| WA-MRWA0197180118 | Pre-Qualification: R2 Construction of a roundabout at the intersection of Scarborough Beach Road and Green Street | Main Roads Western Australia | $7,082,563 |
| WA-MRWA0197180119 | Pre-Qualification: R2 Construction of Midlands Road seal shoulders on existing formation SLK 24.79 to 61.30 - Wheatbelt Region | Main Roads Western Australia | $6,129,046 |
| WA-MRWA0197180079 | Widening of 9.0m seal width to allow for 2 x 3.5m lanes and 2 x 1.0m sealed shoulders. The Works include the following: Tree Removal Subgrade Preparation Construction of basecourse including bitumen stabilisation Seal Culvert extensions Line Marking (Excluding Audible Edge Line) | Main Roads Western Australia | $6,039,553 |
| WA-MRWA0197180126 | Pre-Qualification: R2 Construction of West Coast Highway Intersection Improvements - Metropolitan Region | Main Roads Western Australia | $5,831,456 |
| WA-MRWA0197180093 | Mid West Road Improvements - Brand Highway (H004) & Northampton-Kalbarri Road (M058) - SLK H004 330 & 350 / M058 11.42 to 12.01 Pre-qualification Required - R2 | Main Roads Western Australia | $5,181,836 |
| WA-MRWA0197180123 | Pre-Qualification: R2 Construction of South Western Highway seal shoulders on existing formation SLK 434.95 to 462.08 - Great Southern Region | Main Roads Western Australia | $4,648,967 |
| WA-DPLH301220 | This tender forms Phase 2 Part B of the Northampton Lead Tailings Project and consists of the construction of a permanent containment cell. | Department of Planning, Lands and Heritage | $4,014,713 |
| WA-MRWA0197180065 | Sealing of Shoulders on Existing Formation, Albany Highway (H001) ? SLK 215 to SLK 240 | Main Roads Western Australia | $3,957,491 |
| WA-MRWA0197180144 | Seal Shoulders on Existing Formation SLK 408.61 – 431.13 - Great Southern Region R2 Pre Qualification Required A Non-Mandatory Pre-tender briefing will be held on Wednesday 12 November 2025 commencing at 9:30 am | Main Roads Western Australia | $3,684,829 |
| WA-MRWA0197180146 | Construction of Chidlow York Road (M010) Seal Shoulders on Existing Formation SLK 0.35 – 45.47 | Main Roads Western Australia | $3,676,756 |
| WA-MRWA0197180139 | Construction of Forrest Highway Intersection Improvements Pre-qualification Required Roadworks Category R2 | Main Roads Western Australia | $3,602,146 |
| WA-MRWA0197180112 | Construction of Kings Park Resurfacing and Shoulder Reconditioning - May Dr (1500002) SLK (0.35-3.31) and Lovekin Dr (1500005) SLK(0.29-2.3) | Main Roads Western Australia | $3,140,811 |
| WA-MRWA0197180028 | Construction of Brookton Highway- Rabbit Proof Fence and Corrigin -Quairading Road Intersection Improvement | Main Roads Western Australia | $2,187,034 |
| WA-MRWA003819 | Remove and replace existing pavement. Lime stabilisation of subgrade. Construction of widening. Minor drainage. Sealing and replacement of road furniture. Pre-qualification: To be eligible to tender, Tenderers must be prequalified to Main Roads Roadworks Category R2 or Higher | Main Roads Western Australia | $2,005,994 |
Paid RAG platform
Want a full brief on this supplier before you meet?
The paid RAG platform ingests this supplier's contract history, win rates by agency, and category mix — then answers your team's questions grounded in that data.